Market report
Engineering design tenders in the United Kingdom: monthly market reports
Engineering design tenders in the United Kingdom in September 2026: 55 tenders published (+28% month on month, +25% year on year), estimated at €1,038,077,322 in total, and 48 contracts awarded (+50% month on month, -33% year on year), worth €14,750,997 (awarded value). Buyers with the most tenders: Choice Housing Ireland Limited (3), National Highways Limited (3) and UK Industrial Fusion Solutions Ltd (2); most contracts won: AtkinsRéalis UK Limited (4), Zero Emission Buildings Ltd (2) and HLM Architects (2). GranTender publishes a market report on engineering design tenders in the United Kingdom every month; 10 so far.
Read the latest report: September 2026
The highlighted bar is September 2026. Hover a bar for its figure; the table below has every value.
Every month
| Month | Tenders published | Buyers | Contracts awarded | Winners | Bids per contract |
|---|---|---|---|---|---|
| October 2026 | 32 | 31 | 18 | 17 | — |
| September 2026 | 55 | 47 | 48 | 41 | 9.8 |
| August 2026 | 43 | 36 | 32 | 30 | 12.8 |
| July 2026 | 42 | 38 | 37 | 35 | 17.6 |
| June 2026 | 42 | 38 | 32 | 30 | 9.9 |
| May 2026 | 63 | 51 | 222 | 119 | 61.7 |
| April 2026 | 60 | 51 | 128 | 122 | 84.3 |
| March 2026 | 34 | 31 | 80 | 78 | 20.5 |
| February 2026 | 38 | 32 | 87 | 52 | 11.5 |
| January 2026 | 56 | 47 | 78 | 58 | 6.7 |
| December 2025 | 63 | 52 | 67 | 55 | 12.4 |
| November 2025 | 45 | 39 | 56 | 53 | 27.5 |
| October 2025 | 61 | 50 | 53 | 48 | 13.6 |
| September 2025 | 44 | 37 | 72 | 66 | 231.0 |
| August 2025 | 39 | 30 | 51 | 48 | 16.7 |
| July 2025 | 50 | 44 | 45 | 44 | 10.7 |
| June 2025 | 52 | 47 | 83 | 79 | 5.7 |
| May 2025 | 54 | 45 | 56 | 52 | 24.5 |
| April 2025 | 37 | 32 | 75 | 63 | 31.5 |
| March 2025 | 22 | 20 | 40 | 39 | 41.4 |
| February 2025 | 40 | 38 | 32 | 32 | — |
| January 2025 | 50 | 45 | 42 | 40 | 42.6 |
| December 2024 | 36 | 35 | 38 | 33 | 13.9 |
| November 2024 | 42 | 38 | 29 | 28 | 34.3 |
| October 2024 | 60 | 57 | 82 | 81 | 14.2 |
| September 2024 | 36 | 32 | 44 | 42 | 23.7 |
| August 2024 | 45 | 36 | 151 | 85 | 13.8 |
| July 2024 | 39 | 38 | 37 | 36 | 10.4 |
| June 2024 | 43 | 40 | 21 | 21 | 21.1 |
| May 2024 | 69 | 55 | 52 | 49 | 30.6 |
| April 2024 | 56 | 46 | 108 | 92 | 185.5 |
| March 2024 | 41 | 36 | 106 | 101 | 434.6 |
| February 2024 | 46 | 43 | 141 | 139 | 140.5 |
Market reports
Other topics of Architecture and engineering services
Questions and answers
- How many engineering design tenders were published in the United Kingdom in September 2026?
- 55 (by 47 buyers); for comparison, August 2026: 43, September 2025: 44.
- Who won the most engineering design tenders in the United Kingdom in September 2026?
- By number of contracts: AtkinsRéalis UK Limited (4), Zero Emission Buildings Ltd (2), HLM Architects (2), EB7 Limited (1) and Land Use Consultants Ltd (1); 41 companies won contracts in all.
- Which buyers published the most engineering design tenders in September 2026?
- Choice Housing Ireland Limited (3), National Highways Limited (3), UK Industrial Fusion Solutions Ltd (2), mhs homes group (1) and University of Exeter (1).
- How competitive were engineering design tenders in the United Kingdom in September 2026?
- On average 9.8 bids per contract (31 contracts with a known number of bids); 10% of contracts had a single bid.
- What were the contracts worth in September 2026?
- €14,750,997 (awarded value, 48 contracts); median about €690,000.
How the report is made
Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.