European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Engineering design tenders in the United Kingdom — market report, December 2025

Engineering design tenders in the United Kingdom in December 2025: 63 tenders published (+40% month on month, +75% year on year), estimated at €770,319,592 in total, and 67 contracts awarded (+20% month on month, +76% year on year), worth €56,165,071 (awarded value). Buyers with the most tenders: The Mayor and Commonalty and Citizens of the City of London (4), Nuclear Restoration Services Limited (3) and West Yorkshire Combined Authority (3); most contracts won: Ove Arup & Partners Limited (4), Atkinsréalis UK Limited (3) and Archus Limited (2). On average 12.4 bids per contract; 11% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
63
Contracts awarded
67
Contract value awarded
€56,165,071
Bids per contract
12.4
Tenders published per month
020406080Dec 24: 36Dec 24: 36Dec 24Jan 25: 50Jan 25: 50Jan 25Feb 25: 40Feb 25: 40Feb 25Mar 25: 22Mar 25: 22Mar 25Apr 25: 37Apr 25: 37Apr 25May 25: 54May 25: 54May 25Jun 25: 52Jun 25: 52Jun 25Jul 25: 50Jul 25: 50Jul 25Aug 25: 39Aug 25: 39Aug 25Sep 25: 44Sep 25: 44Sep 25Oct 25: 61Oct 25: 61Oct 25Nov 25: 45Nov 25: 45Nov 25Dec 25: 63Dec 25: 6363Dec 25
Contracts awarded per month
050100Dec 24: 38Dec 24: 38Dec 24Jan 25: 42Jan 25: 42Jan 25Feb 25: 32Feb 25: 32Feb 25Mar 25: 40Mar 25: 40Mar 25Apr 25: 75Apr 25: 75Apr 25May 25: 56May 25: 56May 25Jun 25: 83Jun 25: 83Jun 25Jul 25: 45Jul 25: 45Jul 25Aug 25: 51Aug 25: 51Aug 25Sep 25: 72Sep 25: 72Sep 25Oct 25: 53Oct 25: 53Oct 25Nov 25: 56Nov 25: 56Nov 25Dec 25: 67Dec 25: 6767Dec 25

The highlighted bar is December 2025. Hover a bar for its figure; the table below has every value.

FigureDecember 2025November 2025ChangeDecember 2024Change
Tenders published6345+40%36+75%
Estimated value€770,319,592€139,965,826+450%€275,676,911+179%
Buyers5239+33%35+49%
Contracts awarded6756+20%38+76%
Contract value (awarded)€56,165,071€51,358,848+9%€49,455,852+14%
Winners5553+4%33+67%
Bids per contract12.427.5—13.9—
Single-bid contracts11%18%—0%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • London 7
  • North West (England) 4
  • South East (England) 3
  • East Midlands (England) 2
  • West Midlands (England) 2

Procedures

  • Direct award 17
  • Other procedure 15
  • Open procedure 9
  • Restricted procedure 9
  • Simplified procedure 5
  • not stated 4

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Engineering design

Questions and answers

How many engineering design tenders were published in the United Kingdom in December 2025?
63 (by 52 buyers); for comparison, November 2025: 45, December 2024: 36.
Who won the most engineering design tenders in the United Kingdom in December 2025?
By number of contracts: Ove Arup & Partners Limited (4), Atkinsréalis UK Limited (3), Archus Limited (2), Aecom Limited (2) and Ebl HB Limited (2); 55 companies won contracts in all.
Which buyers published the most engineering design tenders in December 2025?
The Mayor and Commonalty and Citizens of the City of London (4), Nuclear Restoration Services Limited (3), West Yorkshire Combined Authority (3), National Highways Limited (2) and Portsmouth City Council (2).
How competitive were engineering design tenders in the United Kingdom in December 2025?
On average 12.4 bids per contract (19 contracts with a known number of bids); 11% of contracts had a single bid.
What were the contracts worth in December 2025?
€56,165,071 (awarded value, 67 contracts); median about €410,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.