European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Engineering design tenders in the United Kingdom — market report, September 2026

Engineering design tenders in the United Kingdom in September 2026: 55 tenders published (+28% month on month, +25% year on year), estimated at €1,038,077,322 in total, and 48 contracts awarded (+50% month on month, -33% year on year), worth €14,750,997 (awarded value). Buyers with the most tenders: Choice Housing Ireland Limited (3), National Highways Limited (3) and UK Industrial Fusion Solutions Ltd (2); most contracts won: AtkinsRéalis UK Limited (4), Zero Emission Buildings Ltd (2) and HLM Architects (2). On average 9.8 bids per contract; 10% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
55
Contracts awarded
48
Contract value awarded
€14,750,997
Bids per contract
9.8
Tenders published per month
020406080Sep 25: 44Sep 25: 44Sep 25Oct 25: 61Oct 25: 61Oct 25Nov 25: 45Nov 25: 45Nov 25Dec 25: 63Dec 25: 63Dec 25Jan 26: 56Jan 26: 56Jan 26Feb 26: 38Feb 26: 38Feb 26Mar 26: 34Mar 26: 34Mar 26Apr 26: 60Apr 26: 60Apr 26May 26: 63May 26: 63May 26Jun 26: 42Jun 26: 42Jun 26Jul 26: 42Jul 26: 42Jul 26Aug 26: 43Aug 26: 43Aug 26Sep 26: 55Sep 26: 5555Sep 26
Contracts awarded per month
0100200300Sep 25: 72Sep 25: 72Sep 25Oct 25: 53Oct 25: 53Oct 25Nov 25: 56Nov 25: 56Nov 25Dec 25: 67Dec 25: 67Dec 25Jan 26: 78Jan 26: 78Jan 26Feb 26: 87Feb 26: 87Feb 26Mar 26: 80Mar 26: 80Mar 26Apr 26: 128Apr 26: 128Apr 26May 26: 222May 26: 222May 26Jun 26: 32Jun 26: 32Jun 26Jul 26: 37Jul 26: 37Jul 26Aug 26: 32Aug 26: 32Aug 26Sep 26: 48Sep 26: 4848Sep 26

The highlighted bar is September 2026. Hover a bar for its figure; the table below has every value.

FigureSeptember 2026August 2026ChangeSeptember 2025Change
Tenders published5543+28%44+25%
Estimated value€1,038,077,322€3,946,239,199-74%€1,472,978,454-30%
Buyers4736+31%37+27%
Contracts awarded4832+50%72-33%
Contract value (awarded)€14,750,997€480,711,515-97%€46,814,153-68%
Winners4130+37%66-38%
Bids per contract9.812.8—231.0—
Single-bid contracts10%17%—5%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • East of England 4
  • South East (England) 4
  • North West (England) 3
  • North East (England) 2
  • South West (England) 2

Procedures

  • Direct award 14
  • Other procedure 14
  • Open procedure 13
  • not stated 4
  • Simplified procedure 4
  • Negotiated procedure without prior publication 3

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Engineering design

Questions and answers

How many engineering design tenders were published in the United Kingdom in September 2026?
55 (by 47 buyers); for comparison, August 2026: 43, September 2025: 44.
Who won the most engineering design tenders in the United Kingdom in September 2026?
By number of contracts: AtkinsRéalis UK Limited (4), Zero Emission Buildings Ltd (2), HLM Architects (2), EB7 Limited (1) and Land Use Consultants Ltd (1); 41 companies won contracts in all.
Which buyers published the most engineering design tenders in September 2026?
Choice Housing Ireland Limited (3), National Highways Limited (3), UK Industrial Fusion Solutions Ltd (2), mhs homes group (1) and University of Exeter (1).
How competitive were engineering design tenders in the United Kingdom in September 2026?
On average 9.8 bids per contract (31 contracts with a known number of bids); 10% of contracts had a single bid.
What were the contracts worth in September 2026?
€14,750,997 (awarded value, 48 contracts); median about €690,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.