European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Engineering design tenders in Portugal — market report, January 2026

Engineering design tenders in Portugal in January 2026: 117 tenders published (-17% month on month, -45% year on year), estimated at €3,566,455 in total, and 108 contracts awarded (+4% month on month, -38% year on year), worth €2,630,769 (awarded value). Buyers with the most tenders: Município de Oeiras (7), CMPH - DomusSocial - Empresa de Habitação e Manutenção do Município do Porto, E. M. (5) and Município de Sintra (4); most contracts won: TUU Building Design Management, Lda (3), Tabique - Engenharia, Lda. (3) and Skemba, Arquitetura, Engenharia, Lda. (3). On average 5.3 bids per contract; 38% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
117
Contracts awarded
108
Contract value awarded
€2,630,769
Bids per contract
5.3
Tenders published per month
0100200300Jan 25: 213Jan 25: 213Jan 25Feb 25: 238Feb 25: 238Feb 25Mar 25: 250Mar 25: 250Mar 25Apr 25: 212Apr 25: 212Apr 25May 25: 197May 25: 197May 25Jun 25: 204Jun 25: 204Jun 25Jul 25: 237Jul 25: 237Jul 25Aug 25: 149Aug 25: 149Aug 25Sep 25: 219Sep 25: 219Sep 25Oct 25: 184Oct 25: 184Oct 25Nov 25: 129Nov 25: 129Nov 25Dec 25: 141Dec 25: 141Dec 25Jan 26: 117Jan 26: 117117Jan 26
Contracts awarded per month
0100200300Jan 25: 175Jan 25: 175Jan 25Feb 25: 187Feb 25: 187Feb 25Mar 25: 205Mar 25: 205Mar 25Apr 25: 163Apr 25: 163Apr 25May 25: 202May 25: 202May 25Jun 25: 160Jun 25: 160Jun 25Jul 25: 178Jul 25: 178Jul 25Aug 25: 160Aug 25: 160Aug 25Sep 25: 149Sep 25: 149Sep 25Oct 25: 130Oct 25: 130Oct 25Nov 25: 144Nov 25: 144Nov 25Dec 25: 104Dec 25: 104Dec 25Jan 26: 108Jan 26: 108108Jan 26

The highlighted bar is January 2026. Hover a bar for its figure; the table below has every value.

FigureJanuary 2026December 2025ChangeJanuary 2025Change
Tenders published117141-17%213-45%
Estimated value€3,566,455€7,723,600-54%€29,098,837-88%
Buyers8399-16%128-35%
Contracts awarded108104+4%175-38%
Contract value (awarded)€2,630,769€931,140+183%€397,502+562%
Winners8786+1%135-36%
Bids per contract5.33.7—4.5—
Single-bid contracts38%46%—48%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Centro (PT) 2
  • Alentejo 2
  • Norte 1
  • Área Metropolitana de Lisboa 1

Procedures

  • not stated 103
  • Open procedure 12
  • Other procedure 2

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Engineering design

Questions and answers

How many engineering design tenders were published in Portugal in January 2026?
117 (by 83 buyers); for comparison, December 2025: 141, January 2025: 213.
Who won the most engineering design tenders in Portugal in January 2026?
By number of contracts: TUU Building Design Management, Lda (3), Tabique - Engenharia, Lda. (3), Skemba, Arquitetura, Engenharia, Lda. (3), HIDROFUNÇÃO - Consultores de Engenharia, Lda (3) and Paulo Pereira, Serviços de Engenharia Civil, Lda (3); 87 companies won contracts in all.
Which buyers published the most engineering design tenders in January 2026?
Município de Oeiras (7), CMPH - DomusSocial - Empresa de Habitação e Manutenção do Município do Porto, E. M. (5), Município de Sintra (4), Município de Portimão (4) and Município de Loures (3).
How competitive were engineering design tenders in Portugal in January 2026?
On average 5.3 bids per contract (69 contracts with a known number of bids); 38% of contracts had a single bid.
What were the contracts worth in January 2026?
€2,630,769 (awarded value, 108 contracts); median about €310,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.