European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Engineering design tenders in Portugal — market report, December 2025

Engineering design tenders in Portugal in December 2025: 141 tenders published (+9% month on month, -52% year on year), estimated at €7,723,600 in total, and 104 contracts awarded (-28% month on month, -57% year on year), worth €931,140 (awarded value). Buyers with the most tenders: Município de Oeiras (6), CMPH - DomusSocial - Empresa de Habitação e Manutenção do Município do Porto, E. M. (5) and Município de Arouca (4); most contracts won: TUU Building Design Management, Lda (4), Born to proj consultoria e projeto lda (4) and Vitor Hugo - Coordenação e Gestão de Projectos, SA (3). On average 3.7 bids per contract; 46% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
141
Contracts awarded
104
Contract value awarded
€931,140
Bids per contract
3.7
Tenders published per month
0100200300Dec 24: 293Dec 24: 293Dec 24Jan 25: 213Jan 25: 213Jan 25Feb 25: 238Feb 25: 238Feb 25Mar 25: 250Mar 25: 250Mar 25Apr 25: 212Apr 25: 212Apr 25May 25: 197May 25: 197May 25Jun 25: 204Jun 25: 204Jun 25Jul 25: 237Jul 25: 237Jul 25Aug 25: 149Aug 25: 149Aug 25Sep 25: 219Sep 25: 219Sep 25Oct 25: 184Oct 25: 184Oct 25Nov 25: 129Nov 25: 129Nov 25Dec 25: 141Dec 25: 141141Dec 25
Contracts awarded per month
0100200300Dec 24: 241Dec 24: 241Dec 24Jan 25: 175Jan 25: 175Jan 25Feb 25: 187Feb 25: 187Feb 25Mar 25: 205Mar 25: 205Mar 25Apr 25: 163Apr 25: 163Apr 25May 25: 202May 25: 202May 25Jun 25: 160Jun 25: 160Jun 25Jul 25: 178Jul 25: 178Jul 25Aug 25: 160Aug 25: 160Aug 25Sep 25: 149Sep 25: 149Sep 25Oct 25: 130Oct 25: 130Oct 25Nov 25: 144Nov 25: 144Nov 25Dec 25: 104Dec 25: 104104Dec 25

The highlighted bar is December 2025. Hover a bar for its figure; the table below has every value.

FigureDecember 2025November 2025ChangeDecember 2024Change
Tenders published141129+9%293-52%
Estimated value€7,723,600€31,396,624-75%€12,506,022-38%
Buyers9991+9%166-40%
Contracts awarded104144-28%241-57%
Contract value (awarded)€931,140€21,910,390-96%€2,766,906-66%
Winners86115-25%179-52%
Bids per contract3.73.2—3.4—
Single-bid contracts46%46%—42%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Norte 4
  • Algarve 2
  • Centro (PT) 1
  • Alentejo 1

Procedures

  • not stated 117
  • Open procedure 22
  • Restricted procedure 2

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Engineering design

Questions and answers

How many engineering design tenders were published in Portugal in December 2025?
141 (by 99 buyers); for comparison, November 2025: 129, December 2024: 293.
Who won the most engineering design tenders in Portugal in December 2025?
By number of contracts: TUU Building Design Management, Lda (4), Born to proj consultoria e projeto lda (4), Vitor Hugo - Coordenação e Gestão de Projectos, SA (3), Opera Studio Lda (3) and TAVICUBICO, Lda (2); 86 companies won contracts in all.
Which buyers published the most engineering design tenders in December 2025?
Município de Oeiras (6), CMPH - DomusSocial - Empresa de Habitação e Manutenção do Município do Porto, E. M. (5), Município de Arouca (4), Município de Portimão (4) and Universidade de Coimbra (3).
How competitive were engineering design tenders in Portugal in December 2025?
On average 3.7 bids per contract (63 contracts with a known number of bids); 46% of contracts had a single bid.
What were the contracts worth in December 2025?
€931,140 (awarded value, 104 contracts); median about €97,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.