European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Tenders

Transformer tenders in Romania

Transformer tenders in Romania: 434 listed on GranTender since 2024; 1 open now. Buyers with the most tenders: Speeh Hidroelectrica SA (64), Distributie Energie Oltenia S.A. (39) and Distribuție Energie Electrică Romania S.A. (33); suppliers with the most contract awards: Energo Line Equipment (90), Eximprod Power Systems (56) and Techno Volt (18). Sources: SEAP / SICAP and TED. In 2025, 66% of contracts drew a single bid (1.7 bids on average). Data as of 17 November 2026; updated daily.

Tenders
434
Open tenders
1
Awards
483
Awarded value awarded
€143,718,572
Awarded value contract
€97,618,297
Awarded value framework ceiling
€284,107,261
Median contract value awarded
≈ €610
Median contract value contract
≈ €150,000
Median contract value framework ceiling
≈ €330,000
Average bids per contract
1.6
Tenders in 2025
163 -13% on 2024

Median: contracts with a stated value, rounded. Average bids: contracts where the number of bids is published.

Value kinds: awarded — the value in the award decision; contract — the value of the signed or amended contract; paid — the amount actually paid; framework ceiling — the maximum of a framework agreement, given with every winner, not money spent. Different kinds are never added together.

Open tenders

TenderBuyerEstimated valueStatusPublished
Transformatoare de masura de current de 110kVDistribuție Energie Electrică Romania S.A.RON 9,446,841 (≈ €1,794,851)Open11 November 2026

Latest tenders

TenderBuyerEstimated valueStatusPublished
Transformatoare de masura de current de 110kVDistribuție Energie Electrică Romania S.A.RON 9,446,841 (≈ €1,794,851)Open11 November 2026
Transformatoare trifazate de putere,de distribuție, imersate în ulei, în construcție etanșă, cu pierderi reduse, cu reglaj în sarcină cu comutator de ploturi în vid.Distribuție Energie Electrică Romania S.A.RON 7,982,706 (≈ €1,516,673)Closed10 September 2026
Transformatoare de distribuţie de 1/0,4 KVDelgaz Grid S.A.RON 2,647,218 (≈ €502,958)Closed1 September 2026
Inlocuirea transformatoarelor de evacuare putere 440 MVA, 24/415 kV - Unitate 2, CR 46687Societatea Nationala NUCLEARELECTRICA S.A.—Awarded18 August 2026
TRANSFORMATOARE DE PUTERE MONOFAZATE 16 MVA 110/25 KVCompania Nationala de Cai Ferate "CFR" - SARON 15,000,000 (≈ €2,849,923)Closed6 August 2026
Transformatoare de distribuţie echipate cu Regulatoare Automate de TensiuneDelgaz Grid S.A.RON 20,108,060 (≈ €3,820,428)Closed22 June 2026
Transformatoare de distribuţie echipate cu Regulatoare Automate de TensiuneDelgaz Grid S.A.RON 20,108,060 (≈ €3,820,428)Closed22 June 2026
Transformatoare MT/JT- etanse in ulei,pierderi reduse cu regulator automat tensiune.Distribuție Energie Electrică Romania S.A.RON 1,698,064 (≈ €322,623)Closed22 June 2026
Transformator cu izolatie uscata 630 kVA 20 / 0,4 kV - 2 buc.Speeh Hidroelectrica SARON 491,216 (≈ €93,329)Closed12 June 2026
Transformator uscat 1000 kVA, 20/0,4 kv — 1 buc. Transformator uscat 630 kVA, 6,3/0,4 kV - 2 buc. Transformator uscat 630 kVA, 20/0,4 kV — 2 buc.Speeh Hidroelectrica SARON 907,982 (≈ €172,512)Closed27 May 2026
Transformatoare de curent si de tensiuneRetele Electrice Muntenia S.A.RON 6,853,120 (≈ €1,302,058)Closed11 May 2026
Transformatoare de curent si de tensiuneRetele Electrice Muntenia S.A.RON 6,853,119 (≈ €1,302,057)Closed11 May 2026
Transformator de servicii interne 1000 kVA ; 10.5 / 0.4 kV - 2 bucSpeeh Hidroelectrica SARON 596,592 (≈ €113,349)Closed28 April 2026
Furnizare piese de schimb pentru cofrete de tip AG și transformatoareSocietatea Complexul Energetic Valea Jiului SARON 650,900 (≈ €123,668)Cancelled27 April 2026
TransformatoareApaserv Satu Mare S.A.RON 896,691 (≈ €170,367)Closed31 March 2026
“Transformatoare masura combinate 110kV curent-tensiune”Speeh Hidroelectrica SARON 498,134 (≈ €94,643)Closed2 March 2026
Post de transformare si servicii de punere in functiune - CORP SPITAL + AMBULATORIU SPITALULUIMunicipiul Vatra Dornei—Awarded11 December 2025
LOT 3: Transformatoare de curent 123 kV, 2x300/5/5/5/5 A – 3 bucatiSpeeh Hidroelectrica SARON 143,768 (≈ €28,512)Closed10 December 2025
Transformator servicii interne 1000 kVA 15,75/0,4 kV CHE MărişeluSpeeh Hidroelectrica SARON 220,579 (≈ €43,745)Closed17 November 2025
Achiziție și montaj AT 4 400MVA, 400/220kV în stația 400/220/110kV MintiaCompania Nationala de Transport al Energiei Electrice "Transelectrica" S.A.RON 31,365,685 (≈ €6,220,388)Closed5 November 2025

Competition and prices

In 2025, contracts drew 1.7 bids on average (median 1) and 66% drew a single bid — based on 29 contracts with a known number of bids. Compared with 2024, in 2025 the median value fell 67% and the share of single-bid contracts fell from 86% to 66%. The usual procedures: open procedure (57%), simplified procedure (32%), negotiated procedure (7%) — of 97 tenders with a stated procedure.

The most contracts went to Energo Line Equipment (90), Eximprod Power Systems (56) and Techno Volt (18) — together 34% of all contracts.

YearContractsMedian valueMiddle half of valuesBids on averageSingle bid
2024173€870€110 – €8,7001.286% (28)
2025165€290€77 – €5,2001.766% (29)
2026 (so far)125€460€77 – €33,0001.957% (42)
All years483€610€92 – €9,7001.670% (115)

Values: contracts with a stated value in EUR, each value kind on its own (awarded or contract value), approximate (±3 %). Bids: contracts of procedures with competition whose number of bids the source publishes (1–100 bids); the sources publish it for some contracts only (TED ≈ 3 in 4, Spain all, Poland about half, Italy few), so each figure states its base and is shown from 20 contracts. A contract counts in the year of its award (else of its tender). Figures as of 13 November 2026, recomputed every week.

Where you have a chance

Since 1 November 2024, 59% of the 74 contracts with a known number of bids had a single bid; the median was 1 bid. The number of bids is known for 74 of the 308 contracts from procedures with competition.

Buyers who often get few offers

The buyers below usually received one or two offers per contract — an offer from you would stand out.

BuyerContracts with known bidsMedian bidsSingle bid
Distributie Energie Oltenia S.A.40180%
Distribuție Energie Electrică Romania S.A.18150%

In the last 12 months, 5 companies won their first contract in our records here — 3% of the 158 contracts (our records start on 1 January 2024).

Contracts awarded since 1 November 2024 (the last 24 months). Bids as the source publishes them, 1 to 100 per contract, in procedures with competition only (a direct award has one offer by design). As of 13 November 2026.

Main CPV divisions

CPV codes of this topic

  • 31170000 Transformers
  • 31162000 Parts of transformers, inductors and static converters
  • 31213200 Distribution transformers

A tender belongs here when its main CPV code starts with one of these codes; a tender without a usable CPV code (or with a general one) is matched by words of its title. A tender may belong to up to three topics.

Power transformers in neighbouring countries

Today, 24 tenders in the same niche are open in neighbouring countries.

Public tenders in the EU and the EEA are open to companies from every EU and EEA country on the same terms as local ones, and to companies from countries with a procurement agreement with the EU (such as Switzerland, the United Kingdom and Ukraine) for the contracts it covers. In countries outside the EU and the EEA, the notice says who may bid. Open means the deadline has not passed (today's date). Neighbours: countries with a land border, a fixed link or a short sea crossing.

Market reports

Power transformers by city

Power transformers in other countries

Power transformers across Europe

Topics in Machinery, equipment, repair and installation

Questions and answers

Which transformer tenders in Romania are open now?
1 of the 434 transformer tenders in Romania listed on GranTender is open for bids. For example: Transformatoare de masura de current de 110kV.
Where can I find transformer tenders in Romania?
GranTender lists them in one place, from SEAP / SICAP and TED, with their buyers, winners and contract values; 1 is open now. Search in one country at a time (the first 5 results) is free; search across all countries at once, full result lists, saved keywords with an e-mail once a week and exports come with a plan.
Who wins the most transformer tenders in Romania?
By number of contracts won: Energo Line Equipment (90), Eximprod Power Systems (56), Techno Volt (18).
Which buyers publish the most transformer tenders in Romania?
By number of tenders: Speeh Hidroelectrica SA (64), Distributie Energie Oltenia S.A. (39), Distribuție Energie Electrică Romania S.A. (33).
Which CPV codes belong to “Power transformers”?
31170000 Transformers; 31162000 Parts of transformers, inductors and static converters; 31213200 Distribution transformers; plus tenders without a usable CPV code whose title names the topic.
How many bids do transformer tenders in Romania receive on average?
In 2025, contracts drew 1.7 bids on average (median 1) and 66% drew a single bid — based on 29 contracts with a known number of bids.
Which procedures are used for transformer tenders in Romania?
The usual procedures: open procedure (57%), simplified procedure (32%), negotiated procedure (7%) — of 97 tenders with a stated procedure.
Which buyers get few offers in transformer tenders in Romania?
Since 1 November 2024, these buyers usually received one or two offers per contract: Distributie Energie Oltenia S.A. (median 1 bid over 40 contracts) and Distribuție Energie Electrică Romania S.A. (median 1 bid over 18 contracts). Since 1 November 2024, 59% of the 74 contracts with a known number of bids had a single bid; the median was 1 bid.

CPV 2008 (Regulation (EC) No 213/2008), © European Union, Publications Office — via the eForms SDK, CC BY 4.0.