Tenders
Transformer tenders in Romania
Transformer tenders in Romania: 434 listed on GranTender since 2024; 1 open now. Buyers with the most tenders: Speeh Hidroelectrica SA (64), Distributie Energie Oltenia S.A. (39) and Distribuție Energie Electrică Romania S.A. (33); suppliers with the most contract awards: Energo Line Equipment (90), Eximprod Power Systems (56) and Techno Volt (18). Sources: SEAP / SICAP and TED. In 2025, 66% of contracts drew a single bid (1.7 bids on average). Data as of 17 November 2026; updated daily.
- Tenders
- 434
- Open tenders
- 1
- Awards
- 483
- Awarded value awarded
- €143,718,572
- Awarded value contract
- €97,618,297
- Awarded value framework ceiling
- €284,107,261
- Median contract value awarded
- ≈ €610
- Median contract value contract
- ≈ €150,000
- Median contract value framework ceiling
- ≈ €330,000
- Average bids per contract
- 1.6
- Tenders in 2025
- 163 -13% on 2024
Median: contracts with a stated value, rounded. Average bids: contracts where the number of bids is published.
Value kinds: awarded — the value in the award decision; contract — the value of the signed or amended contract; paid — the amount actually paid; framework ceiling — the maximum of a framework agreement, given with every winner, not money spent. Different kinds are never added together.
Open tenders
| Tender | Buyer | Estimated value | Status | Published |
|---|---|---|---|---|
| Transformatoare de masura de current de 110kV | Distribuție Energie Electrică Romania S.A. | RON 9,446,841 (≈ €1,794,851) | Open | 11 November 2026 |
Latest tenders
Top buyers
- Speeh Hidroelectrica SA64
- Distributie Energie Oltenia S.A.39
- Distribuție Energie Electrică Romania S.A.33
- Universitatea Stefan cel Mare Suceava17
- Retele Electrice Muntenia S.A.13
- Delgaz Grid S.A.10
- Compania Nationala de Cai Ferate "CFR" - SA7
- C.N.C.F."CFR" Sa- Sucursala Regionala CF Constanța - Unitate Operațională7
- Institutul National de Cercetare Dezvoltare pentru Fizica si Inginerie Nucleara "Horia Hulubei"6
- Societatea Compania de Transport Public Iasi SA6
Top winners
Competition and prices
In 2025, contracts drew 1.7 bids on average (median 1) and 66% drew a single bid — based on 29 contracts with a known number of bids. Compared with 2024, in 2025 the median value fell 67% and the share of single-bid contracts fell from 86% to 66%. The usual procedures: open procedure (57%), simplified procedure (32%), negotiated procedure (7%) — of 97 tenders with a stated procedure.
The most contracts went to Energo Line Equipment (90), Eximprod Power Systems (56) and Techno Volt (18) — together 34% of all contracts.
| Year | Contracts | Median value | Middle half of values | Bids on average | Single bid |
|---|---|---|---|---|---|
| 2024 | 173 | €870 | €110 – €8,700 | 1.2 | 86% (28) |
| 2025 | 165 | €290 | €77 – €5,200 | 1.7 | 66% (29) |
| 2026 (so far) | 125 | €460 | €77 – €33,000 | 1.9 | 57% (42) |
| All years | 483 | €610 | €92 – €9,700 | 1.6 | 70% (115) |
Values: contracts with a stated value in EUR, each value kind on its own (awarded or contract value), approximate (±3 %). Bids: contracts of procedures with competition whose number of bids the source publishes (1–100 bids); the sources publish it for some contracts only (TED ≈ 3 in 4, Spain all, Poland about half, Italy few), so each figure states its base and is shown from 20 contracts. A contract counts in the year of its award (else of its tender). Figures as of 13 November 2026, recomputed every week.
Where you have a chance
Since 1 November 2024, 59% of the 74 contracts with a known number of bids had a single bid; the median was 1 bid. The number of bids is known for 74 of the 308 contracts from procedures with competition.
Buyers who often get few offers
The buyers below usually received one or two offers per contract — an offer from you would stand out.
| Buyer | Contracts with known bids | Median bids | Single bid |
|---|---|---|---|
| Distributie Energie Oltenia S.A. | 40 | 1 | 80% |
| Distribuție Energie Electrică Romania S.A. | 18 | 1 | 50% |
In the last 12 months, 5 companies won their first contract in our records here — 3% of the 158 contracts (our records start on 1 January 2024).
Contracts awarded since 1 November 2024 (the last 24 months). Bids as the source publishes them, 1 to 100 per contract, in procedures with competition only (a direct award has one offer by design). As of 13 November 2026.
Main CPV divisions
CPV codes of this topic
A tender belongs here when its main CPV code starts with one of these codes; a tender without a usable CPV code (or with a general one) is matched by words of its title. A tender may belong to up to three topics.
Power transformers in neighbouring countries
Today, 24 tenders in the same niche are open in neighbouring countries.
Public tenders in the EU and the EEA are open to companies from every EU and EEA country on the same terms as local ones, and to companies from countries with a procurement agreement with the EU (such as Switzerland, the United Kingdom and Ukraine) for the contracts it covers. In countries outside the EU and the EEA, the notice says who may bid. Open means the deadline has not passed (today's date). Neighbours: countries with a land border, a fixed link or a short sea crossing.
Market reports
Power transformers by city
Power transformers in other countries
Power transformers across Europe
Topics in Machinery, equipment, repair and installation
Questions and answers
- Which transformer tenders in Romania are open now?
- 1 of the 434 transformer tenders in Romania listed on GranTender is open for bids. For example: Transformatoare de masura de current de 110kV.
- Where can I find transformer tenders in Romania?
- GranTender lists them in one place, from SEAP / SICAP and TED, with their buyers, winners and contract values; 1 is open now. Search in one country at a time (the first 5 results) is free; search across all countries at once, full result lists, saved keywords with an e-mail once a week and exports come with a plan.
- Who wins the most transformer tenders in Romania?
- By number of contracts won: Energo Line Equipment (90), Eximprod Power Systems (56), Techno Volt (18).
- Which buyers publish the most transformer tenders in Romania?
- By number of tenders: Speeh Hidroelectrica SA (64), Distributie Energie Oltenia S.A. (39), Distribuție Energie Electrică Romania S.A. (33).
- Which CPV codes belong to “Power transformers”?
- 31170000 Transformers; 31162000 Parts of transformers, inductors and static converters; 31213200 Distribution transformers; plus tenders without a usable CPV code whose title names the topic.
- How many bids do transformer tenders in Romania receive on average?
- In 2025, contracts drew 1.7 bids on average (median 1) and 66% drew a single bid — based on 29 contracts with a known number of bids.
- Which procedures are used for transformer tenders in Romania?
- The usual procedures: open procedure (57%), simplified procedure (32%), negotiated procedure (7%) — of 97 tenders with a stated procedure.
- Which buyers get few offers in transformer tenders in Romania?
- Since 1 November 2024, these buyers usually received one or two offers per contract: Distributie Energie Oltenia S.A. (median 1 bid over 40 contracts) and Distribuție Energie Electrică Romania S.A. (median 1 bid over 18 contracts). Since 1 November 2024, 59% of the 74 contracts with a known number of bids had a single bid; the median was 1 bid.
CPV 2008 (Regulation (EC) No 213/2008), © European Union, Publications Office — via the eForms SDK, CC BY 4.0.