Tenders
Railway electrification tenders in Spain
Railway electrification tenders in Spain: 378 listed on GranTender since 2024; 3 open now. The median awarded contract value is about €220,000 (377 contracts with a stated value). Buyers with the most tenders: Ferrocarrils de la Generalitat de Catalunya (19), Ferrocarrils de la Generalitat de Catalunya (16) and Euskal Trenbide Sarea-Comisión Delegada en Materia de Contratación de ETS (8); suppliers with the most contract awards: Syneox Rail SL (24), UTE Mantenimiento Noroeste Lote 2 (23) and Elecnor Servicios y Proyectos, S.A.U. (17). Sources: PLACSP, Registre públic de contractes de Catalunya (RPC) — Catalan public contracts register, open data (Generalitat) and TED. In 2025 the median contract value was €120,000; 35% of contracts drew a single bid (4.2 bids on average). Data as of 17 November 2026; updated daily.
- Tenders
- 378
- Open tenders
- 3
- Awards
- 416
- Awarded value awarded
- €1,419,321,238
- Awarded value contract
- €352,846,708
- Median contract value awarded
- ≈ €220,000
- Median contract value contract
- ≈ €11,000,000
- Average bids per contract
- 3.0
- Tenders in 2025
- 98 -39% on 2024
Median: contracts with a stated value, rounded. Average bids: contracts where the number of bids is published.
Value kinds: awarded — the value in the award decision; contract — the value of the signed or amended contract; paid — the amount actually paid; framework ceiling — the maximum of a framework agreement, given with every winner, not money spent. Different kinds are never added together.
Open tenders
| Tender | Buyer | Estimated value | Status | Published |
|---|---|---|---|---|
| Redacción de proyecto constructivo y ejecución de las obras para la electrificación de la aguja 1-3 y la adecuación de feederes en el entorno de la estación de Sant Vicenç de Calders, Tarragona | ADIF - Presidencia | €3,012,463 | Open | 30 October 2026 |
| Proyecto constructivo para la electrificación de la línea Zaragoza - Teruel - Sagunto, tramo Teruel - Sagunto. Línea aérea de contacto. | ADIF -Consejo de Administración | €51,538,518 | Open | 29 October 2026 |
| Ejecución de las obras del proyecto constructivo para la electrificación de la línea Zaragoza – Teruel – Sagunto, tramo Teruel – Sagunto. Línea aérea de contacto. | Administrador de Infraestructuras Ferroviarias | €51,538,518 | Open | 23 October 2026 |
Latest tenders
Top buyers
- Ferrocarrils de la Generalitat de Catalunya19
- Ferrocarrils de la Generalitat de Catalunya16
- Euskal Trenbide Sarea-Comisión Delegada en Materia de Contratación de ETS8
- Junta de Gobierno del Ayuntamiento de Murcia7
- Rectorado de la Universidad del País Vasco7
- Consejo de Seguridad Nuclear4
- Gerencia de Ferrocarrils de la Generalitat Valenciana3
- FgcRail, SA3
- Gerencia de Transportes Urbanos de Sevilla, SAM3
- Gerencias de los Institutos de la Agencia Estatal Consejo Superior de Investigaciones Científicas3
Top winners
Competition and prices
In 2025, half of the contracts were worth between €15,000 and €1.5 million, with a median of €120,000 (91 contracts with a stated awarded value). Contracts drew 4.2 bids on average (median 2) and 35% drew a single bid — based on 52 contracts with a known number of bids. Compared with 2024, in 2025 the share of single-bid contracts fell from 74% to 35%. The usual procedures: open procedure (39%), other procedures (27%), direct award (22%) — of 322 tenders with a stated procedure.
The most contracts went to Syneox Rail SL (24), UTE Mantenimiento Noroeste Lote 2 (23) and Elecnor Servicios y Proyectos, S.A.U. (17) — together 15% of all contracts.
| Year | Contracts | Median value | Middle half of values | Bids on average | Single bid |
|---|---|---|---|---|---|
| 2024 | 178 | €120,000 | €5,800 – €370,000 | 1.9 | 74% (142) |
| 2025 | 91 | €120,000 | €15,000 – €1.5 million | 4.2 | 35% (52) |
| 2026 (so far) | 70 | €270,000 | €18,000 – €920,000 | 2.8 | 52% (46) |
| All years | 416 | €220,000 | €12,000 – €1 million | 3.0 | 56% (287) |
Values: contracts with a stated value in EUR, each value kind on its own (awarded or contract value), approximate (±3 %). Bids: contracts of procedures with competition whose number of bids the source publishes (1–100 bids); the sources publish it for some contracts only (TED ≈ 3 in 4, Spain all, Poland about half, Italy few), so each figure states its base and is shown from 20 contracts. A contract counts in the year of its award (else of its tender). Figures as of 13 November 2026, recomputed every week.
Where you have a chance
Since 1 November 2024, 49% of the 124 contracts with a known number of bids had a single bid; the median was 2 bids. The number of bids is known for 124 of the 139 contracts from procedures with competition.
Buyers who often get few offers
The buyers below usually received one or two offers per contract — an offer from you would stand out.
| Buyer | Contracts with known bids | Median bids | Single bid |
|---|---|---|---|
| Euskal Trenbide Sarea-Comisión Delegada en Materia de Contratación de ETS | 6 | 2 | 0% |
In the last 12 months, 6 companies won their first contract in our records here — 8% of the 73 contracts (our records start on 1 January 2024).
Contracts awarded since 1 November 2024 (the last 24 months). Bids as the source publishes them, 1 to 100 per contract, in procedures with competition only (a direct award has one offer by design). As of 13 November 2026.
Main CPV divisions
CPV codes of this topic
A tender belongs here when its main CPV code starts with one of these codes; a tender without a usable CPV code (or with a general one) is matched by words of its title. A tender may belong to up to three topics.
Railway electrification and overhead lines in neighbouring countries
No tender in the same niche is open today in neighbouring countries; 118 were published there since 2024.
- France — 0 open today · how to bid in France
Public tenders in the EU and the EEA are open to companies from every EU and EEA country on the same terms as local ones, and to companies from countries with a procurement agreement with the EU (such as Switzerland, the United Kingdom and Ukraine) for the contracts it covers. Open means the deadline has not passed (today's date). Neighbours: countries with a land border, a fixed link or a short sea crossing.
Market reports
Railway electrification and overhead lines by city
Railway electrification and overhead lines in other countries
Railway electrification and overhead lines across Europe
Topics in Civil engineering and infrastructure
Questions and answers
- Which railway electrification tenders in Spain are open now?
- 3 of the 378 railway electrification tenders in Spain listed on GranTender are open for bids. For example: Redacción de proyecto constructivo y ejecución de las obras para la electrificación de la aguja 1-3 y la adec…; Proyecto constructivo para la electrificación de la línea Zaragoza - Teruel - Sagunto, tramo Teruel - Sagunto…; Ejecución de las obras del proyecto constructivo para la electrificación de la línea Zaragoza – Teruel – Sagu….
- Where can I find railway electrification tenders in Spain?
- GranTender lists them in one place, from PLACSP, Registre públic de contractes de Catalunya (RPC) — Catalan public contracts register, open data (Generalitat) and TED, with their buyers, winners and contract values; 3 are open now. Search in one country at a time (the first 5 results) is free; search across all countries at once, full result lists, saved keywords with an e-mail once a week and exports come with a plan.
- Who wins the most railway electrification tenders in Spain?
- By number of contracts won: Syneox Rail SL (24), UTE Mantenimiento Noroeste Lote 2 (23), Elecnor Servicios y Proyectos, S.A.U. (17).
- Which buyers publish the most railway electrification tenders in Spain?
- By number of tenders: Ferrocarrils de la Generalitat de Catalunya (19), Ferrocarrils de la Generalitat de Catalunya (16), Euskal Trenbide Sarea-Comisión Delegada en Materia de Contratación de ETS (8).
- Which CPV codes belong to “Railway electrification and overhead lines”?
- 45234160 Catenary's construction works; 45234170 Locomotive-substations construction works; plus tenders without a usable CPV code whose title names the topic.
- How many bids do railway electrification tenders in Spain receive on average?
- In 2025, contracts drew 4.2 bids on average (median 2) and 35% drew a single bid — based on 52 contracts with a known number of bids.
- How much are contracts for railway electrification tenders in Spain worth?
- In 2025, half of the contracts were worth between €15,000 and €1.5 million, with a median of €120,000 (91 contracts with a stated awarded value). Compared with 2024, in 2025 the share of single-bid contracts fell from 74% to 35%.
- Which procedures are used for railway electrification tenders in Spain?
- The usual procedures: open procedure (39%), other procedures (27%), direct award (22%) — of 322 tenders with a stated procedure.
- Which buyers get few offers in railway electrification tenders in Spain?
- Since 1 November 2024, these buyers usually received one or two offers per contract: Euskal Trenbide Sarea-Comisión Delegada en Materia de Contratación de ETS (median 2 bids over 6 contracts). Since 1 November 2024, 49% of the 124 contracts with a known number of bids had a single bid; the median was 2 bids.
CPV 2008 (Regulation (EC) No 213/2008), © European Union, Publications Office — via the eForms SDK, CC BY 4.0.