Engineering consultancy tenders in Portugal — market report, October 2026

Engineering consultancy tenders in Portugal in October 2026: 59 tenders published (-35% month on month, -55% year on year), estimated at €2,576,884 in total, and 26 contracts awarded (-53% month on month, -70% year on year), worth €1,140,143 (awarded value). Buyers with the most tenders: Infraestruturas de Portugal, S. A. (8), Município de Albufeira (4) and AgdA - Águas Públicas do Alentejo, S. A. (3); most contracts won: Matéria - Atelier de Arquitectura e Engenharia, Unipessoal, Lda. (8), Tecnicouto, Lda. (1) and Systemability Unipessoal Lda (1). On average 6.3 bids per contract; 45% of contracts had a single bid. Report made on 8 November 2026.

Tenders published
59
Contracts awarded
26
Contract value awarded
€1,140,143
Bids per contract
6.3
Tenders published per month
050100150Oct 25: 131Oct 25: 131Oct 25Nov 25: 78Nov 25: 78Nov 25Dec 25: 78Dec 25: 78Dec 25Jan 26: 90Jan 26: 90Jan 26Feb 26: 107Feb 26: 107Feb 26Mar 26: 103Mar 26: 103Mar 26Apr 26: 97Apr 26: 97Apr 26May 26: 112May 26: 112May 26Jun 26: 97Jun 26: 97Jun 26Jul 26: 103Jul 26: 103Jul 26Aug 26: 92Aug 26: 92Aug 26Sep 26: 91Sep 26: 91Sep 26Oct 26: 59Oct 26: 5959Oct 26
Contracts awarded per month
050100Oct 25: 86Oct 25: 86Oct 25Nov 25: 62Nov 25: 62Nov 25Dec 25: 81Dec 25: 81Dec 25Jan 26: 84Jan 26: 84Jan 26Feb 26: 77Feb 26: 77Feb 26Mar 26: 93Mar 26: 93Mar 26Apr 26: 91Apr 26: 91Apr 26May 26: 97May 26: 97May 26Jun 26: 77Jun 26: 77Jun 26Jul 26: 95Jul 26: 95Jul 26Aug 26: 70Aug 26: 70Aug 26Sep 26: 55Sep 26: 55Sep 26Oct 26: 26Oct 26: 2626Oct 26

The highlighted bar is October 2026. Hover a bar for its figure; the table below has every value.

FigureOctober 2026September 2026ChangeOctober 2025Change
Tenders published5991-35%131-55%
Estimated value€2,576,884€4,711,733-45%€2,155,538+20%
Buyers3862-39%77-51%
Contracts awarded2655-53%86-70%
Contract value (awarded)€1,140,143€1,152,080-1%€889,307+28%
Winners1851-65%73-75%
Bids per contract6.32.4—2.0—
Single-bid contracts45%53%—73%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Centro (PT) 2
  • Grande Lisboa 2
  • Oeste e Vale do Tejo 1
  • Região Autónoma da Madeira 1

Procedures

  • not stated 45
  • Open procedure 10
  • Negotiated procedure without prior publication 4

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Engineering consultancy

Questions and answers

How many engineering consultancy tenders were published in Portugal in October 2026?
59 (by 38 buyers); for comparison, September 2026: 91, October 2025: 131.
Who won the most engineering consultancy tenders in Portugal in October 2026?
By number of contracts: Matéria - Atelier de Arquitectura e Engenharia, Unipessoal, Lda. (8), Tecnicouto, Lda. (1), Systemability Unipessoal Lda (1), Levels and Targets lda (1) and AQUALOGUS - Engenharia e Ambiente, Lda. (1); 18 companies won contracts in all.
Which buyers published the most engineering consultancy tenders in October 2026?
Infraestruturas de Portugal, S. A. (8), Município de Albufeira (4), AgdA - Águas Públicas do Alentejo, S. A. (3), Município de Almada (3) and Município de Oeiras (2).
How competitive were engineering consultancy tenders in Portugal in October 2026?
On average 6.3 bids per contract (20 contracts with a known number of bids); 45% of contracts had a single bid.
What were the contracts worth in October 2026?
€1,140,143 (awarded value, 26 contracts); median about €7,700.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 8 November 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.