Engineering studies tenders in Greece — market report, February 2026

Engineering studies tenders in Greece in February 2026: 70 tenders published (+25% month on month, -31% year on year), estimated at €19,586,658 in total, and 38 contracts awarded (+3% month on month, -31% year on year), worth €203,039 (awarded value). Buyers with the most tenders: ΕΛΛΗΝΙΚΟ ΑΝΟΙΚΤΟ ΠΑΝΕΠΙΣΤΗΜΙΟ (4), ΥΠΟΥΡΓΕΙΟ ΠΑΙΔΕΙΑΣ, ΘΡΗΣΚΕΥΜΑΤΩΝ ΚΑΙ ΑΘΛΗΤΙΣΜΟΥ (4) and ΙΝΣΤΙΤ. ΦΑΡΜΑΚ. ΕΡΕΥΝΑΣ & ΤΕΧΝΟΛΟΓ.(ΙΑΝΗΚΕΙ ΕΟΦ) (4); most contracts won: Seven Sigma P.C. (2), ΛΥΡΑΣ ΜΑΡΚΟΣ & ΣΥΝΕΡΓΑΤΕΣ ΕΕ (2) and ΒΑΣΙΛΕΙΟΣ ΧΑΝΤΖΑΚΟΣ & ΣΙΑ ΕΕ (2). On average 2.3 bids per contract; 61% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
70
Contracts awarded
38
Contract value awarded
€203,039
Bids per contract
2.3
Tenders published per month
0100200300Feb 25: 101Feb 25: 101Feb 25Mar 25: 116Mar 25: 116Mar 25Apr 25: 146Apr 25: 146Apr 25May 25: 120May 25: 120May 25Jun 25: 111Jun 25: 111Jun 25Jul 25: 121Jul 25: 121Jul 25Aug 25: 87Aug 25: 87Aug 25Sep 25: 127Sep 25: 127Sep 25Oct 25: 117Oct 25: 117Oct 25Nov 25: 110Nov 25: 110Nov 25Dec 25: 208Dec 25: 208Dec 25Jan 26: 56Jan 26: 56Jan 26Feb 26: 70Feb 26: 7070Feb 26
Contracts awarded per month
020406080Feb 25: 55Feb 25: 55Feb 25Mar 25: 50Mar 25: 50Mar 25Apr 25: 59Apr 25: 59Apr 25May 25: 37May 25: 37May 25Jun 25: 50Jun 25: 50Jun 25Jul 25: 45Jul 25: 45Jul 25Aug 25: 26Aug 25: 26Aug 25Sep 25: 59Sep 25: 59Sep 25Oct 25: 39Oct 25: 39Oct 25Nov 25: 42Nov 25: 42Nov 25Dec 25: 64Dec 25: 64Dec 25Jan 26: 37Jan 26: 37Jan 26Feb 26: 38Feb 26: 3838Feb 26

The highlighted bar is February 2026. Hover a bar for its figure; the table below has every value.

FigureFebruary 2026January 2026ChangeFebruary 2025Change
Tenders published7056+25%101-31%
Estimated value€19,586,658€9,549,654+105%€25,114,734-22%
Buyers2523+9%32-22%
Contracts awarded3837+3%55-31%
Contract value (awarded)€203,039€4,089,150-95%€529,442-62%
Winners2524+4%29-14%
Bids per contract2.31.4—2.4—
Single-bid contracts61%77%—57%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Attiki 21
  • Kentriki Makedonia 12
  • Notio Aigaio 6
  • Kriti 5
  • Anatoliki Makedonia, Thraki 4

Procedures

  • Direct award 50
  • Other procedure 12
  • Negotiated procedure without prior publication 5
  • Open procedure 3

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Engineering and feasibility studies

Questions and answers

How many engineering studies tenders were published in Greece in February 2026?
70 (by 25 buyers); for comparison, January 2026: 56, February 2025: 101.
Who won the most engineering studies tenders in Greece in February 2026?
By number of contracts: Seven Sigma P.C. (2), ΛΥΡΑΣ ΜΑΡΚΟΣ & ΣΥΝΕΡΓΑΤΕΣ ΕΕ (2), ΒΑΣΙΛΕΙΟΣ ΧΑΝΤΖΑΚΟΣ & ΣΙΑ ΕΕ (2), FTI France (2) and OMSSE ΕΞΥΠΠ ΕΠΕ (2); 25 companies won contracts in all.
Which buyers published the most engineering studies tenders in February 2026?
ΕΛΛΗΝΙΚΟ ΑΝΟΙΚΤΟ ΠΑΝΕΠΙΣΤΗΜΙΟ (4), ΥΠΟΥΡΓΕΙΟ ΠΑΙΔΕΙΑΣ, ΘΡΗΣΚΕΥΜΑΤΩΝ ΚΑΙ ΑΘΛΗΤΙΣΜΟΥ (4), ΙΝΣΤΙΤ. ΦΑΡΜΑΚ. ΕΡΕΥΝΑΣ & ΤΕΧΝΟΛΟΓ.(ΙΑΝΗΚΕΙ ΕΟΦ) (4), ΝΟΜ.ΓΕΝ. ΝΟΣΟΚΟΜΕΙΟ ΚΑΤΕΡΙΝΗΣ (3) and ΚΟΙΝΩΝΙΑ ΤΗΣ ΠΛΗΡΟΦΟΡΙΑΣ ΑΕ (2).
How competitive were engineering studies tenders in Greece in February 2026?
On average 2.3 bids per contract (23 contracts with a known number of bids); 61% of contracts had a single bid.
What were the contracts worth in February 2026?
€203,039 (awarded value, 38 contracts); median about €14,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.