European public procurement and grants data from official registers · Data as of 18 November 2026; updated daily.

Market report

Road design tenders in the United Kingdom — market report, March 2026

Road design tenders in the United Kingdom in March 2026: 59 tenders published (+37% month on month, +31% year on year), estimated at €18,795,325 in total, and 81 contracts awarded (+29% month on month, -25% year on year), worth €12,787,744 (awarded value). Buyers with the most tenders: DfTc - Department for Transport (6), Defence Infrastructure Organisation (4) and West Midlands Combined Authority (3); most contracts won: Matchtech Group (UK) Limited (6), Jacobs U.K Limited (4) and Systra Limited (3). On average 3.7 bids per contract; 22% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
59
Contracts awarded
81
Contract value awarded
€12,787,744
Bids per contract
3.7
Tenders published per month
0204060Mar 25: 45Mar 25: 45Mar 25Apr 25: 42Apr 25: 42Apr 25May 25: 59May 25: 59May 25Jun 25: 46Jun 25: 46Jun 25Jul 25: 47Jul 25: 47Jul 25Aug 25: 49Aug 25: 49Aug 25Sep 25: 44Sep 25: 44Sep 25Oct 25: 45Oct 25: 45Oct 25Nov 25: 48Nov 25: 48Nov 25Dec 25: 56Dec 25: 56Dec 25Jan 26: 47Jan 26: 47Jan 26Feb 26: 43Feb 26: 43Feb 26Mar 26: 59Mar 26: 5959Mar 26
Contracts awarded per month
050100150Mar 25: 108Mar 25: 108Mar 25Apr 25: 75Apr 25: 75Apr 25May 25: 28May 25: 28May 25Jun 25: 52Jun 25: 52Jun 25Jul 25: 53Jul 25: 53Jul 25Aug 25: 36Aug 25: 36Aug 25Sep 25: 42Sep 25: 42Sep 25Oct 25: 39Oct 25: 39Oct 25Nov 25: 42Nov 25: 42Nov 25Dec 25: 57Dec 25: 57Dec 25Jan 26: 32Jan 26: 32Jan 26Feb 26: 63Feb 26: 63Feb 26Mar 26: 81Mar 26: 8181Mar 26

The highlighted bar is March 2026. Hover a bar for its figure; the table below has every value.

FigureMarch 2026February 2026ChangeMarch 2025Change
Tenders published5943+37%45+31%
Estimated value€18,795,325€2,041,845,772-99%€1,221,481,189-98%
Buyers4230+40%37+14%
Contracts awarded8163+29%108-25%
Contract value (awarded)€12,787,744€34,811,078-63%€13,689,211-7%
Winners6154+13%91-33%
Bids per contract3.74.8—43.1—
Single-bid contracts22%6%—2%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • South East (England) 6
  • North West (England) 2
  • Yorkshire and the Humber 2
  • London 2
  • North East (England) 1

Procedures

  • Other procedure 31
  • Open procedure 8
  • not stated 7
  • Direct award 6
  • Simplified procedure 3
  • Negotiated procedure without prior publication 2

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Road, bridge and traffic design

Questions and answers

How many road design tenders were published in the United Kingdom in March 2026?
59 (by 42 buyers); for comparison, February 2026: 43, March 2025: 45.
Who won the most road design tenders in the United Kingdom in March 2026?
By number of contracts: Matchtech Group (UK) Limited (6), Jacobs U.K Limited (4), Systra Limited (3), Aecom Limited (3) and Waterman Infrastructure & Environment Limited (2); 61 companies won contracts in all.
Which buyers published the most road design tenders in March 2026?
DfTc - Department for Transport (6), Defence Infrastructure Organisation (4), West Midlands Combined Authority (3), Environment Agency (3) and Liverpool City Council (2).
How competitive were road design tenders in the United Kingdom in March 2026?
On average 3.7 bids per contract (9 contracts with a known number of bids); 22% of contracts had a single bid.
What were the contracts worth in March 2026?
€12,787,744 (awarded value, 81 contracts); median about €120,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.