European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Power line construction tenders in France — market report, October 2025

Power line construction tenders in France in October 2025: 76 tenders published (+65% month on month, -32% year on year), estimated at €316,876,209 in total, and 119 contracts awarded (+23% month on month, -12% year on year), worth €530,056,251 (awarded value). Buyers with the most tenders: Morbihan Energies (22), Territoire d'Energie des Pyrénées-Atlantiques (TE 64) (16) and Synd. Dptal d'Energies de la Manche (16); most contracts won: COPLAND (5), Dalkia Electrotechnics (4) and SANUELEC (4). On average 2.5 bids per contract; 32% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
76
Contracts awarded
119
Contract value awarded
€530,056,251
Bids per contract
2.5
Tenders published per month
050100150200Oct 24: 112Oct 24: 112Oct 24Nov 24: 76Nov 24: 76Nov 24Dec 24: 160Dec 24: 160Dec 24Jan 25: 85Jan 25: 85Jan 25Feb 25: 48Feb 25: 48Feb 25Mar 25: 76Mar 25: 76Mar 25Apr 25: 83Apr 25: 83Apr 25May 25: 46May 25: 46May 25Jun 25: 40Jun 25: 40Jun 25Jul 25: 182Jul 25: 182Jul 25Aug 25: 94Aug 25: 94Aug 25Sep 25: 46Sep 25: 46Sep 25Oct 25: 76Oct 25: 7676Oct 25
Contracts awarded per month
0100200300Oct 24: 135Oct 24: 135Oct 24Nov 24: 157Nov 24: 157Nov 24Dec 24: 240Dec 24: 240Dec 24Jan 25: 128Jan 25: 128Jan 25Feb 25: 31Feb 25: 31Feb 25Mar 25: 69Mar 25: 69Mar 25Apr 25: 92Apr 25: 92Apr 25May 25: 91May 25: 91May 25Jun 25: 32Jun 25: 32Jun 25Jul 25: 262Jul 25: 262Jul 25Aug 25: 116Aug 25: 116Aug 25Sep 25: 97Sep 25: 97Sep 25Oct 25: 119Oct 25: 119119Oct 25

The highlighted bar is October 2025. Hover a bar for its figure; the table below has every value.

FigureOctober 2025September 2025ChangeOctober 2024Change
Tenders published7646+65%112-32%
Estimated value€316,876,209€96,817,000+227%€314,964,748+1%
Buyers1921-10%20-5%
Contracts awarded11997+23%135-12%
Contract value (awarded)€530,056,251€136,710,095+288%€23,400,000+2,165%
Winners4649-6%56-18%
Bids per contract2.54.9—3.0—
Single-bid contracts32%21%—22%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Nouvelle-Aquitaine 4
  • Centre — Val de Loire 1
  • Occitanie 1
  • Auvergne-Rhône-Alpes 1

Procedures

  • not stated 60
  • Open procedure 13
  • Negotiated procedure 3

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Power lines and substations

Questions and answers

How many power line construction tenders were published in France in October 2025?
76 (by 19 buyers); for comparison, September 2025: 46, October 2024: 112.
Who won the most power line construction tenders in France in October 2025?
By number of contracts: COPLAND (5), Dalkia Electrotechnics (4), SANUELEC (4), Sdel Atlantis (3) and Entreprise de Reseaux et Sources (3); 46 companies won contracts in all.
Which buyers published the most power line construction tenders in October 2025?
Morbihan Energies (22), Territoire d'Energie des Pyrénées-Atlantiques (TE 64) (16), Synd. Dptal d'Energies de la Manche (16), Syndicat Audois d'Energies et du Numerique (3) and Enedis SA (2).
How competitive were power line construction tenders in France in October 2025?
On average 2.5 bids per contract (65 contracts with a known number of bids); 32% of contracts had a single bid.
What were the contracts worth in October 2025?
€530,056,251 (awarded value, 119 contracts); median about €2,600,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.