Market report
Bridge construction tenders in France — market report, April 2026
Bridge construction tenders in France in April 2026: 199 tenders published (+4% month on month, -3% year on year), estimated at €53,438,333 in total, and 144 contracts awarded (-17% month on month, -17% year on year), worth €105,353,322 (awarded value). Buyers with the most tenders: DIR Atlantique (5), Societe Concessionnaire Francaise pour la Construction et l'Exploitation du Tunnel Routier Sous le Mont-Blanc (4) and Conseil Départemental du Lot-et-Garonne (4); most contracts won: SAS COFEX Méditerranée / RCA (ROBERT CHARIER APPLICATION) / Entreprise CHAPELLE / MARRON BTP / ETABLISSEMENTS JOUVERT (5), Nge Genie Civil (4) and SAS AGTP (4). On average 4.4 bids per contract; 13% of contracts had a single bid. Report made on 27 October 2026.
- Tenders published
- 199
- Contracts awarded
- 144
- Contract value awarded
- €105,353,322
- Bids per contract
- 4.4
The highlighted bar is April 2026. Hover a bar for its figure; the table below has every value.
| Figure | April 2026 | March 2026 | Change | April 2025 | Change |
|---|---|---|---|---|---|
| Tenders published | 199 | 192 | +4% | 205 | -3% |
| Estimated value | €53,438,333 | €9,408,000 | +468% | €5,162,943 | +935% |
| Buyers | 79 | 88 | -10% | 103 | -23% |
| Contracts awarded | 144 | 174 | -17% | 173 | -17% |
| Contract value (awarded) | €105,353,322 | €59,212,821 | +78% | €64,434,242 | +64% |
| Winners | 74 | 91 | -19% | 110 | -33% |
| Bids per contract | 4.4 | 5.9 | — | 4.2 | — |
| Single-bid contracts | 13% | 4% | — | 8% | — |
Buyers with the most tenders
Companies with the most contracts
Where the tenders were
Procedures
The report's aggregates: the figures, the comparisons and the top lists by name and count.
All reports: Bridge construction and repair
Questions and answers
- How many bridge construction tenders were published in France in April 2026?
- 199 (by 79 buyers); for comparison, March 2026: 192, April 2025: 205.
- Who won the most bridge construction tenders in France in April 2026?
- By number of contracts: SAS COFEX Méditerranée / RCA (ROBERT CHARIER APPLICATION) / Entreprise CHAPELLE / MARRON BTP / ETABLISSEMENTS JOUVERT (5), Nge Genie Civil (4), SAS AGTP (4), AMEXBOIS (4) and R.C.A. - Robert Chartier Application (4); 74 companies won contracts in all.
- Which buyers published the most bridge construction tenders in April 2026?
- DIR Atlantique (5), Societe Concessionnaire Francaise pour la Construction et l'Exploitation du Tunnel Routier Sous le Mont-Blanc (4), Conseil Départemental du Lot-et-Garonne (4), Commune de Wimereux (4) and Commune de Marcy l'Etoile (4).
- How competitive were bridge construction tenders in France in April 2026?
- On average 4.4 bids per contract (116 contracts with a known number of bids); 13% of contracts had a single bid.
- What were the contracts worth in April 2026?
- €105,353,322 (awarded value, 144 contracts); median about €4,100,000.
How the report is made
Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.