Switchgear tenders in Spain — market report, July 2025

Switchgear tenders in Spain in July 2025: 110 tenders published (+72% month on month, +62% year on year), estimated at €12,075,680 in total, and 133 contracts awarded (+37% month on month, +75% year on year), worth €9,631,347 (awarded value). Buyers with the most tenders: Rectorado de la Universidad de Málaga (17), Diputació de Barcelona (4) and Reus Mobilitat i Serveis, SA (4); most contracts won: TEDITRONIC, SL (5), Sonepar Spain, S.A.U. (5) and Fluival Fluidos y Valvulería, S.L. (4). On average 3.7 bids per contract; 50% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
110
Contracts awarded
133
Contract value awarded
€9,631,347
Bids per contract
3.7
Tenders published per month
050100150Jul 24: 68Jul 24: 68Jul 24Aug 24: 42Aug 24: 42Aug 24Sep 24: 50Sep 24: 50Sep 24Oct 24: 79Oct 24: 79Oct 24Nov 24: 84Nov 24: 84Nov 24Dec 24: 70Dec 24: 70Dec 24Jan 25: 66Jan 25: 66Jan 25Feb 25: 75Feb 25: 75Feb 25Mar 25: 64Mar 25: 64Mar 25Apr 25: 65Apr 25: 65Apr 25May 25: 56May 25: 56May 25Jun 25: 64Jun 25: 64Jun 25Jul 25: 110Jul 25: 110110Jul 25
Contracts awarded per month
050100150Jul 24: 76Jul 24: 76Jul 24Aug 24: 33Aug 24: 33Aug 24Sep 24: 72Sep 24: 72Sep 24Oct 24: 88Oct 24: 88Oct 24Nov 24: 94Nov 24: 94Nov 24Dec 24: 97Dec 24: 97Dec 24Jan 25: 46Jan 25: 46Jan 25Feb 25: 70Feb 25: 70Feb 25Mar 25: 82Mar 25: 82Mar 25Apr 25: 70Apr 25: 70Apr 25May 25: 95May 25: 95May 25Jun 25: 97Jun 25: 97Jun 25Jul 25: 133Jul 25: 133133Jul 25

The highlighted bar is July 2025. Hover a bar for its figure; the table below has every value.

FigureJuly 2025June 2025ChangeJuly 2024Change
Tenders published11064+72%68+62%
Estimated value€12,075,680€1,728,333+599%€2,223,372+443%
Buyers6046+30%56+7%
Contracts awarded13397+37%76+75%
Contract value (awarded)€9,631,347€9,076,382+6%€2,155,862+347%
Winners9071+27%62+45%
Bids per contract3.72.2—2.3—
Single-bid contracts50%58%—44%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Andalucía 25
  • Comunidad de Madrid 10
  • Cantabria 5
  • Castilla-La Mancha 5
  • Castilla y León 4

Procedures

  • Direct award 48
  • not stated 37
  • Open procedure 11
  • Simplified procedure 8
  • Restricted procedure 3
  • Other procedure 2

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Switchgear and distribution boards

Questions and answers

How many switchgear tenders were published in Spain in July 2025?
110 (by 60 buyers); for comparison, June 2025: 64, July 2024: 68.
Who won the most switchgear tenders in Spain in July 2025?
By number of contracts: TEDITRONIC, SL (5), Sonepar Spain, S.A.U. (5), Fluival Fluidos y Valvulería, S.L. (4), Dis Electric, S.A.U. (4) and Suministres Electrics el Prat SL (4); 90 companies won contracts in all.
Which buyers published the most switchgear tenders in July 2025?
Rectorado de la Universidad de Málaga (17), Diputació de Barcelona (4), Reus Mobilitat i Serveis, SA (4), Reus Desenvolupament Econòmic, SA (4) and Aena. Dirección de Contratación (4).
How competitive were switchgear tenders in Spain in July 2025?
On average 3.7 bids per contract (98 contracts with a known number of bids); 50% of contracts had a single bid.
What were the contracts worth in July 2025?
€9,631,347 (awarded value, 133 contracts); median about €1,900.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.