Market report

Solar PV installation tenders in Spain — market report, May 2025

Solar PV installation tenders in Spain in May 2025: 79 tenders published (+55% month on month, -21% year on year), estimated at €63,089,566 in total, and 119 contracts awarded (+20% month on month, -17% year on year), worth €9,952,962 (awarded value). Buyers with the most tenders: Infraestructures de la Generalitat de Catalunya, SAU (13), Gerencia de la Entidad Pública Empresarial Aguas de Ames EPEL (5) and Universitat Autònoma de Barcelona (2); most contracts won: Canaria Electrica de EERR y Movilidad SL (5), ACISA (4) and Solit Energia SL (3). On average 4.7 bids per contract; 39% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
79
Contracts awarded
119
Contract value awarded
€9,952,962
Bids per contract
4.7
Tenders published per month
050100150May 24: 100May 24: 100May 24Jun 24: 144Jun 24: 144Jun 24Jul 24: 111Jul 24: 111Jul 24Aug 24: 49Aug 24: 49Aug 24Sep 24: 99Sep 24: 99Sep 24Oct 24: 72Oct 24: 72Oct 24Nov 24: 86Nov 24: 86Nov 24Dec 24: 75Dec 24: 75Dec 24Jan 25: 63Jan 25: 63Jan 25Feb 25: 62Feb 25: 62Feb 25Mar 25: 52Mar 25: 52Mar 25Apr 25: 51Apr 25: 51Apr 25May 25: 79May 25: 7979May 25
Contracts awarded per month
050100150200May 24: 143May 24: 143May 24Jun 24: 199Jun 24: 199Jun 24Jul 24: 165Jul 24: 165Jul 24Aug 24: 99Aug 24: 99Aug 24Sep 24: 156Sep 24: 156Sep 24Oct 24: 134Oct 24: 134Oct 24Nov 24: 147Nov 24: 147Nov 24Dec 24: 163Dec 24: 163Dec 24Jan 25: 98Jan 25: 98Jan 25Feb 25: 115Feb 25: 115Feb 25Mar 25: 114Mar 25: 114Mar 25Apr 25: 99Apr 25: 99Apr 25May 25: 119May 25: 119119May 25

The highlighted bar is May 2025. Hover a bar for its figure; the table below has every value.

FigureMay 2025April 2025ChangeMay 2024Change
Tenders published7951+55%100-21%
Estimated value€63,089,566€10,808,246+484%€21,118,234+199%
Buyers6048+25%53+13%
Contracts awarded11999+20%143-17%
Contract value (awarded)€9,952,962€40,642,117-76%€7,280,016+37%
Winners9594+1%111-14%
Bids per contract4.74.3—5.9—
Single-bid contracts39%48%—44%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Andalucía 8
  • Comunidad de Madrid 6
  • Galicia 5
  • Castilla y León 4
  • Cataluña 4

Procedures

  • not stated 29
  • Direct award 21
  • Simplified procedure 15
  • Open procedure 12
  • Negotiated procedure 2

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Solar PV installation works

Questions and answers

How many solar PV installation tenders were published in Spain in May 2025?
79 (by 60 buyers); for comparison, April 2025: 51, May 2024: 100.
Who won the most solar PV installation tenders in Spain in May 2025?
By number of contracts: Canaria Electrica de EERR y Movilidad SL (5), ACISA (4), Solit Energia SL (3), Ecoclima Barcelona, S.L. (3) and Enertec Estudio SL (3); 95 companies won contracts in all.
Which buyers published the most solar PV installation tenders in May 2025?
Infraestructures de la Generalitat de Catalunya, SAU (13), Gerencia de la Entidad Pública Empresarial Aguas de Ames EPEL (5), Universitat Autònoma de Barcelona (2), Aena. Dirección de Contratación (2) and Alcaldia del Ayuntamiento de Vallehermoso (2).
How competitive were solar PV installation tenders in Spain in May 2025?
On average 4.7 bids per contract (90 contracts with a known number of bids); 39% of contracts had a single bid.
What were the contracts worth in May 2025?
€9,952,962 (awarded value, 119 contracts); median about €24,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.