European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Pump maintenance tenders in Spain — market report, October 2025

Pump maintenance tenders in Spain in October 2025: 107 tenders published (+26% month on month, +45% year on year), estimated at €11,210,554 in total, and 103 contracts awarded (+2% month on month, -2% year on year), worth €2,923,416 (awarded value). Buyers with the most tenders: Aigües de Manresa, SA (10), Barcelona Cicle de l'Aigua, SA (6) and Rectorado de la Universidad de Málaga (4); most contracts won: TMB-SERHID, S.L. (5), HIMANAR, S.L. (4) and Hermanos Oliva Bahia SLL (4). On average 1.5 bids per contract; 74% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
107
Contracts awarded
103
Contract value awarded
€2,923,416
Bids per contract
1.5
Tenders published per month
050100150Oct 24: 74Oct 24: 74Oct 24Nov 24: 91Nov 24: 91Nov 24Dec 24: 78Dec 24: 78Dec 24Jan 25: 57Jan 25: 57Jan 25Feb 25: 64Feb 25: 64Feb 25Mar 25: 81Mar 25: 81Mar 25Apr 25: 55Apr 25: 55Apr 25May 25: 59May 25: 59May 25Jun 25: 70Jun 25: 70Jun 25Jul 25: 82Jul 25: 82Jul 25Aug 25: 81Aug 25: 81Aug 25Sep 25: 85Sep 25: 85Sep 25Oct 25: 107Oct 25: 107107Oct 25
Contracts awarded per month
050100150Oct 24: 105Oct 24: 105Oct 24Nov 24: 132Nov 24: 132Nov 24Dec 24: 103Dec 24: 103Dec 24Jan 25: 47Jan 25: 47Jan 25Feb 25: 85Feb 25: 85Feb 25Mar 25: 83Mar 25: 83Mar 25Apr 25: 64Apr 25: 64Apr 25May 25: 87May 25: 87May 25Jun 25: 98Jun 25: 98Jun 25Jul 25: 107Jul 25: 107Jul 25Aug 25: 79Aug 25: 79Aug 25Sep 25: 101Sep 25: 101Sep 25Oct 25: 103Oct 25: 103103Oct 25

The highlighted bar is October 2025. Hover a bar for its figure; the table below has every value.

FigureOctober 2025September 2025ChangeOctober 2024Change
Tenders published10785+26%74+45%
Estimated value€11,210,554€3,038,855+269%€29,291,228-62%
Buyers7064+9%63+11%
Contracts awarded103101+2%105-2%
Contract value (awarded)€2,923,416€3,151,833-7%€2,392,104+22%
Winners85850%91-7%
Bids per contract1.51.4—1.7—
Single-bid contracts74%75%—66%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Castilla-La Mancha 17
  • Andalucía 14
  • Comunitat Valenciana 11
  • Comunidad de Madrid 10
  • Castilla y León 5

Procedures

  • Direct award 58
  • not stated 26
  • Open procedure 11
  • Simplified procedure 11
  • Negotiated procedure without prior publication 1

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Pump and valve maintenance

Questions and answers

How many pump maintenance tenders were published in Spain in October 2025?
107 (by 70 buyers); for comparison, September 2025: 85, October 2024: 74.
Who won the most pump maintenance tenders in Spain in October 2025?
By number of contracts: TMB-SERHID, S.L. (5), HIMANAR, S.L. (4), Hermanos Oliva Bahia SLL (4), Bombas Alicante, S.L. (3) and Climatizacion y Refrigeracion Mallorklima SL (2); 85 companies won contracts in all.
Which buyers published the most pump maintenance tenders in October 2025?
Aigües de Manresa, SA (10), Barcelona Cicle de l'Aigua, SA (6), Rectorado de la Universidad de Málaga (4), Alcaldía del Ayuntamiento de Munera (4) and Presidencia de la Diputación Provincial de Salamanca (4).
How competitive were pump maintenance tenders in Spain in October 2025?
On average 1.5 bids per contract (77 contracts with a known number of bids); 74% of contracts had a single bid.
What were the contracts worth in October 2025?
€2,923,416 (awarded value, 103 contracts); median about €2,700.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.