Pump maintenance tenders in Spain in August 2025: 81 tenders published (-1% month on month, +14% year on year), estimated at €10,088,790 in total, and 79 contracts awarded (-26% month on month, -1% year on year), worth €944,301 (awarded value). Buyers with the most tenders: Gerencia de la Entidad Pública Empresarial Aguas de Ames EPEL (5), Alcaldía del Ayuntamiento de Munera (4) and Junta de Gobierno Local del Ayuntamiento de Alicante (4); most contracts won: Bombas Alicante, S.L. (5), Devesa Tecnicas y Comercios SL (3) and Serloga Instalaciones, S.L. (3). On average 1.2 bids per contract; 86% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
81
Contracts awarded
79
Contract value awarded
€944,301
Bids per contract
1.2
Tenders published per month
050100Aug 24: 71Aug 24: 71Aug 24Sep 24: 55Sep 24: 55Sep 24Oct 24: 74Oct 24: 74Oct 24Nov 24: 91Nov 24: 91Nov 24Dec 24: 78Dec 24: 78Dec 24Jan 25: 57Jan 25: 57Jan 25Feb 25: 64Feb 25: 64Feb 25Mar 25: 81Mar 25: 81Mar 25Apr 25: 55Apr 25: 55Apr 25May 25: 59May 25: 59May 25Jun 25: 70Jun 25: 70Jun 25Jul 25: 82Jul 25: 82Jul 25Aug 25: 81Aug 25: 8181Aug 25
Contracts awarded per month
050100150Aug 24: 80Aug 24: 80Aug 24Sep 24: 77Sep 24: 77Sep 24Oct 24: 105Oct 24: 105Oct 24Nov 24: 132Nov 24: 132Nov 24Dec 24: 103Dec 24: 103Dec 24Jan 25: 47Jan 25: 47Jan 25Feb 25: 85Feb 25: 85Feb 25Mar 25: 83Mar 25: 83Mar 25Apr 25: 64Apr 25: 64Apr 25May 25: 87May 25: 87May 25Jun 25: 98Jun 25: 98Jun 25Jul 25: 107Jul 25: 107Jul 25Aug 25: 79Aug 25: 7979Aug 25

The highlighted bar is August 2025. Hover a bar for its figure; the table below has every value.

FigureAugust 2025July 2025ChangeAugust 2024Change
Tenders published8182-1%71+14%
Estimated value€10,088,790€21,635,502-53%€15,267,855-34%
Buyers5860-3%63-8%
Contracts awarded79107-26%80-1%
Contract value (awarded)€944,301€6,946,636-86%€4,241,471-78%
Winners6789-25%71-6%
Bids per contract1.21.7—1.5—
Single-bid contracts86%75%—81%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Castilla-La Mancha 22
  • Comunitat Valenciana 14
  • Galicia 5
  • Cantabria 4
  • Castilla y León 4

Procedures

  • Direct award 56
  • not stated 14
  • Simplified procedure 5
  • Open procedure 4
  • Negotiated procedure without prior publication 1
  • Other procedure 1

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Pump and valve maintenance

Questions and answers

How many pump maintenance tenders were published in Spain in August 2025?
81 (by 58 buyers); for comparison, July 2025: 82, August 2024: 71.
Who won the most pump maintenance tenders in Spain in August 2025?
By number of contracts: Bombas Alicante, S.L. (5), Devesa Tecnicas y Comercios SL (3), Serloga Instalaciones, S.L. (3), Xuquer Land, S.L. (2) and PETROSUPORT S.L. (2); 67 companies won contracts in all.
Which buyers published the most pump maintenance tenders in August 2025?
Gerencia de la Entidad Pública Empresarial Aguas de Ames EPEL (5), Alcaldía del Ayuntamiento de Munera (4), Junta de Gobierno Local del Ayuntamiento de Alicante (4), Rectorado de la Universidad de Cantabria (3) and Alcaldía del Ayuntamiento de Alborea (3).
How competitive were pump maintenance tenders in Spain in August 2025?
On average 1.2 bids per contract (65 contracts with a known number of bids); 86% of contracts had a single bid.
What were the contracts worth in August 2025?
€944,301 (awarded value, 79 contracts); median about €3,100.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.