European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Pump maintenance tenders in Spain — market report, May 2025

Pump maintenance tenders in Spain in May 2025: 59 tenders published (+7% month on month, -20% year on year), estimated at €5,023,903 in total, and 87 contracts awarded (+36% month on month, -38% year on year), worth €16,814,002 (awarded value). Buyers with the most tenders: Presidencia del Consell Insular d'Eivissa (3), Alcaldía del Ayuntamiento de Villanueva de la Serena (2) and Gerencia de Servicios Sociales de la Junta de Castilla y León (2); most contracts won: Pinturas Sabi, S.A. (3), Eiffage Energía, S.L.U. (2) and NOVAPOX, SL (2). On average 1.6 bids per contract; 72% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
59
Contracts awarded
87
Contract value awarded
€16,814,002
Bids per contract
1.6
Tenders published per month
050100May 24: 74May 24: 74May 24Jun 24: 75Jun 24: 75Jun 24Jul 24: 79Jul 24: 79Jul 24Aug 24: 71Aug 24: 71Aug 24Sep 24: 55Sep 24: 55Sep 24Oct 24: 74Oct 24: 74Oct 24Nov 24: 91Nov 24: 91Nov 24Dec 24: 78Dec 24: 78Dec 24Jan 25: 57Jan 25: 57Jan 25Feb 25: 64Feb 25: 64Feb 25Mar 25: 81Mar 25: 81Mar 25Apr 25: 55Apr 25: 55Apr 25May 25: 59May 25: 5959May 25
Contracts awarded per month
050100150May 24: 140May 24: 140May 24Jun 24: 134Jun 24: 134Jun 24Jul 24: 109Jul 24: 109Jul 24Aug 24: 80Aug 24: 80Aug 24Sep 24: 77Sep 24: 77Sep 24Oct 24: 105Oct 24: 105Oct 24Nov 24: 132Nov 24: 132Nov 24Dec 24: 103Dec 24: 103Dec 24Jan 25: 47Jan 25: 47Jan 25Feb 25: 85Feb 25: 85Feb 25Mar 25: 83Mar 25: 83Mar 25Apr 25: 64Apr 25: 64Apr 25May 25: 87May 25: 8787May 25

The highlighted bar is May 2025. Hover a bar for its figure; the table below has every value.

FigureMay 2025April 2025ChangeMay 2024Change
Tenders published5955+7%74-20%
Estimated value€5,023,903€9,906,015-49%€7,718,305-35%
Buyers5144+16%57-11%
Contracts awarded8764+36%140-38%
Contract value (awarded)€16,814,002€3,609,922+366%€63,426,884-73%
Winners8055+45%107-25%
Bids per contract1.61.7—3.0—
Single-bid contracts72%78%—58%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Andalucía 7
  • Illes Balears 6
  • Castilla y León 5
  • Canarias 5
  • Comunidad de Madrid 4

Procedures

  • Direct award 34
  • Simplified procedure 10
  • Open procedure 7
  • not stated 6
  • Negotiated procedure without prior publication 1
  • Other procedure 1

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Pump and valve maintenance

Questions and answers

How many pump maintenance tenders were published in Spain in May 2025?
59 (by 51 buyers); for comparison, April 2025: 55, May 2024: 74.
Who won the most pump maintenance tenders in Spain in May 2025?
By number of contracts: Pinturas Sabi, S.A. (3), Eiffage Energía, S.L.U. (2), NOVAPOX, SL (2), Sur de Importación y Exportación de Navalez de Cadiz, SL (2) and Salinas y Perez, SL (2); 80 companies won contracts in all.
Which buyers published the most pump maintenance tenders in May 2025?
Presidencia del Consell Insular d'Eivissa (3), Alcaldía del Ayuntamiento de Villanueva de la Serena (2), Gerencia de Servicios Sociales de la Junta de Castilla y León (2), IMAS - Gerència (2) and Rectorado de la Universidad del País Vasco (2).
How competitive were pump maintenance tenders in Spain in May 2025?
On average 1.6 bids per contract (79 contracts with a known number of bids); 72% of contracts had a single bid.
What were the contracts worth in May 2025?
€16,814,002 (awarded value, 87 contracts); median about €3,100.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.