European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Fire protection installation tenders in Spain — market report, October 2026

Fire protection installation tenders in Spain in October 2026: 108 tenders published (+21% month on month, +2% year on year), estimated at €8,251,227 in total, and 72 contracts awarded (+20% month on month, -47% year on year), worth €4,104,872 (awarded value). Buyers with the most tenders: Director Gerente de FREMAP (33), Departamento de Salud Alcoy. Dirección Económica-Gerencia (4) and Aena. Dirección de Contratación (4); most contracts won: Construcciones Nogerey SL (6), Fulton Servicios Integrales SA (3) and Clece FS SA (2). On average 1.3 bids per contract; 75% of contracts had a single bid. Report made on 8 November 2026.

Tenders published
108
Contracts awarded
72
Contract value awarded
€4,104,872
Bids per contract
1.3
Tenders published per month
050100150Oct 25: 106Oct 25: 106Oct 25Nov 25: 112Nov 25: 112Nov 25Dec 25: 91Dec 25: 91Dec 25Jan 26: 58Jan 26: 58Jan 26Feb 26: 43Feb 26: 43Feb 26Mar 26: 74Mar 26: 74Mar 26Apr 26: 70Apr 26: 70Apr 26May 26: 66May 26: 66May 26Jun 26: 75Jun 26: 75Jun 26Jul 26: 74Jul 26: 74Jul 26Aug 26: 70Aug 26: 70Aug 26Sep 26: 89Sep 26: 89Sep 26Oct 26: 108Oct 26: 108108Oct 26
Contracts awarded per month
050100150200Oct 25: 137Oct 25: 137Oct 25Nov 25: 152Nov 25: 152Nov 25Dec 25: 112Dec 25: 112Dec 25Jan 26: 38Jan 26: 38Jan 26Feb 26: 68Feb 26: 68Feb 26Mar 26: 111Mar 26: 111Mar 26Apr 26: 91Apr 26: 91Apr 26May 26: 78May 26: 78May 26Jun 26: 90Jun 26: 90Jun 26Jul 26: 73Jul 26: 73Jul 26Aug 26: 57Aug 26: 57Aug 26Sep 26: 60Sep 26: 60Sep 26Oct 26: 72Oct 26: 7272Oct 26

The highlighted bar is October 2026. Hover a bar for its figure; the table below has every value.

FigureOctober 2026September 2026ChangeOctober 2025Change
Tenders published10889+21%106+2%
Estimated value€8,251,227€19,866,230-58%€7,062,089+17%
Buyers5776-25%74-23%
Contracts awarded7260+20%137-47%
Contract value (awarded)€4,104,872€4,265,711-4%€7,287,864-44%
Winners5852+12%110-47%
Bids per contract1.32.0—2.2—
Single-bid contracts75%50%—52%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Comunidad de Madrid 48
  • Andalucía 8
  • Comunitat Valenciana 7
  • Canarias 7
  • Castilla y León 6

Procedures

  • Direct award 71
  • Simplified procedure 19
  • Open procedure 13
  • Other procedure 5

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Fire protection systems and hydrants

Questions and answers

How many fire protection installation tenders were published in Spain in October 2026?
108 (by 57 buyers); for comparison, September 2026: 89, October 2025: 106.
Who won the most fire protection installation tenders in Spain in October 2026?
By number of contracts: Construcciones Nogerey SL (6), Fulton Servicios Integrales SA (3), Clece FS SA (2), Imelcea Levantina SL (2) and SIEF2, SL (2); 58 companies won contracts in all.
Which buyers published the most fire protection installation tenders in October 2026?
Director Gerente de FREMAP (33), Departamento de Salud Alcoy. Dirección Económica-Gerencia (4), Aena. Dirección de Contratación (4), Jefatura de Intendencia de Asuntos Económicos Este (3) and Jefatura de la Sección de Asuntos Económicos de la Unidad Militar de Emergencias (3).
How competitive were fire protection installation tenders in Spain in October 2026?
On average 1.3 bids per contract (72 contracts with a known number of bids); 75% of contracts had a single bid.
What were the contracts worth in October 2026?
€4,104,872 (awarded value, 72 contracts); median about €8,700.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 8 November 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.