European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Engineering studies tenders in Spain — market report, January 2026

Engineering studies tenders in Spain in January 2026: 52 tenders published (-43% month on month, -12% year on year), estimated at €21,195,635 in total, and 43 contracts awarded (-55% month on month, -35% year on year), worth €5,485,213 (awarded value). Buyers with the most tenders: Consorci Museu d'Art Contemporani de Barcelona (7), Ajuntament de la Canonja (2) and Alcaldía del Concello de Cospeito (2); most contracts won: E-Coordina Gestion Documental SL (2), Ecostudi Sima SLP (1) and Riskless Integral, S.L. (1). On average 1.8 bids per contract; 73% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
52
Contracts awarded
43
Contract value awarded
€5,485,213
Bids per contract
1.8
Tenders published per month
050100150Jan 25: 59Jan 25: 59Jan 25Feb 25: 63Feb 25: 63Feb 25Mar 25: 93Mar 25: 93Mar 25Apr 25: 56Apr 25: 56Apr 25May 25: 63May 25: 63May 25Jun 25: 45Jun 25: 45Jun 25Jul 25: 110Jul 25: 110Jul 25Aug 25: 47Aug 25: 47Aug 25Sep 25: 53Sep 25: 53Sep 25Oct 25: 73Oct 25: 73Oct 25Nov 25: 99Nov 25: 99Nov 25Dec 25: 91Dec 25: 91Dec 25Jan 26: 52Jan 26: 5252Jan 26
Contracts awarded per month
050100150Jan 25: 66Jan 25: 66Jan 25Feb 25: 85Feb 25: 85Feb 25Mar 25: 111Mar 25: 111Mar 25Apr 25: 68Apr 25: 68Apr 25May 25: 89May 25: 89May 25Jun 25: 76Jun 25: 76Jun 25Jul 25: 134Jul 25: 134Jul 25Aug 25: 45Aug 25: 45Aug 25Sep 25: 85Sep 25: 85Sep 25Oct 25: 98Oct 25: 98Oct 25Nov 25: 118Nov 25: 118Nov 25Dec 25: 95Dec 25: 95Dec 25Jan 26: 43Jan 26: 4343Jan 26

The highlighted bar is January 2026. Hover a bar for its figure; the table below has every value.

FigureJanuary 2026December 2025ChangeJanuary 2025Change
Tenders published5291-43%59-12%
Estimated value€21,195,635€3,484,886+508%€6,292,998+237%
Buyers3969-43%52-25%
Contracts awarded4395-55%66-35%
Contract value (awarded)€5,485,213€3,234,892+70%€3,667,825+50%
Winners4283-49%59-29%
Bids per contract1.81.7—2.2—
Single-bid contracts73%69%—66%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Comunitat Valenciana 10
  • Comunidad de Madrid 7
  • Castilla-La Mancha 4
  • Galicia 2
  • País Vasco 2

Procedures

  • Direct award 23
  • not stated 21
  • Open procedure 7
  • Other procedure 1

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Engineering and feasibility studies

Questions and answers

How many engineering studies tenders were published in Spain in January 2026?
52 (by 39 buyers); for comparison, December 2025: 91, January 2025: 59.
Who won the most engineering studies tenders in Spain in January 2026?
By number of contracts: E-Coordina Gestion Documental SL (2), Ecostudi Sima SLP (1), Riskless Integral, S.L. (1), Pinturas Alfonso Cadroy, S.L. (1) and Idom Consulting, Engineering Architecture, S.A. Unipersonal (1); 42 companies won contracts in all.
Which buyers published the most engineering studies tenders in January 2026?
Consorci Museu d'Art Contemporani de Barcelona (7), Ajuntament de la Canonja (2), Alcaldía del Concello de Cospeito (2), Departamento de Salud Alcoy. Dirección Económica-Gerencia (2) and Rectorado de la Universidad del País Vasco (2).
How competitive were engineering studies tenders in Spain in January 2026?
On average 1.8 bids per contract (22 contracts with a known number of bids); 73% of contracts had a single bid.
What were the contracts worth in January 2026?
€5,485,213 (awarded value, 43 contracts); median about €9,700.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.