European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Electrical engineering tenders in Spain — market report, December 2025

Electrical engineering tenders in Spain in December 2025: 72 tenders published (-18% month on month, +95% year on year), estimated at €2,516,554 in total, and 106 contracts awarded (-47% month on month, +71% year on year), worth €1,583,805 (awarded value). Buyers with the most tenders: Figueres de Serveis, SA (32), Forestal Catalana, SA (7) and Alcaldía del Ayuntamiento de Níjar (2); most contracts won: Edistribucion Redes Digitales SLU (29), INFRALECT SL (3) and Energía XXI (3). On average 1.9 bids per contract; 72% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
72
Contracts awarded
106
Contract value awarded
€1,583,805
Bids per contract
1.9
Tenders published per month
050100Dec 24: 37Dec 24: 37Dec 24Jan 25: 28Jan 25: 28Jan 25Feb 25: 40Feb 25: 40Feb 25Mar 25: 35Mar 25: 35Mar 25Apr 25: 43Apr 25: 43Apr 25May 25: 33May 25: 33May 25Jun 25: 40Jun 25: 40Jun 25Jul 25: 70Jul 25: 70Jul 25Aug 25: 58Aug 25: 58Aug 25Sep 25: 70Sep 25: 70Sep 25Oct 25: 63Oct 25: 63Oct 25Nov 25: 88Nov 25: 88Nov 25Dec 25: 72Dec 25: 7272Dec 25
Contracts awarded per month
050100150200Dec 24: 62Dec 24: 62Dec 24Jan 25: 80Jan 25: 80Jan 25Feb 25: 127Feb 25: 127Feb 25Mar 25: 104Mar 25: 104Mar 25Apr 25: 83Apr 25: 83Apr 25May 25: 69May 25: 69May 25Jun 25: 111Jun 25: 111Jun 25Jul 25: 122Jul 25: 122Jul 25Aug 25: 107Aug 25: 107Aug 25Sep 25: 128Sep 25: 128Sep 25Oct 25: 189Oct 25: 189Oct 25Nov 25: 200Nov 25: 200Nov 25Dec 25: 106Dec 25: 106106Dec 25

The highlighted bar is December 2025. Hover a bar for its figure; the table below has every value.

FigureDecember 2025November 2025ChangeDecember 2024Change
Tenders published7288-18%37+95%
Estimated value€2,516,554€4,487,193-44%€854,220+195%
Buyers3043-30%31-3%
Contracts awarded106200-47%62+71%
Contract value (awarded)€1,583,805€3,746,315-58%€2,923,844-46%
Winners67100-33%47+43%
Bids per contract1.91.4—2.6—
Single-bid contracts72%79%—52%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Comunitat Valenciana 7
  • Andalucía 5
  • Canarias 5
  • Región de Murcia 3
  • Galicia 1

Procedures

  • not stated 45
  • Direct award 18
  • Simplified procedure 4
  • Open procedure 3
  • Negotiated procedure without prior publication 1
  • Restricted procedure 1

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Electrical engineering services

Questions and answers

How many electrical engineering tenders were published in Spain in December 2025?
72 (by 30 buyers); for comparison, November 2025: 88, December 2024: 37.
Who won the most electrical engineering tenders in Spain in December 2025?
By number of contracts: Edistribucion Redes Digitales SLU (29), INFRALECT SL (3), Energía XXI (3), Alquiler de Maquinaria Company 2011 Sociedad Limitada (2) and IMDELEC 2006, SL (2); 67 companies won contracts in all.
Which buyers published the most electrical engineering tenders in December 2025?
Figueres de Serveis, SA (32), Forestal Catalana, SA (7), Alcaldía del Ayuntamiento de Níjar (2), Presidencia de EPE Tugasa Turismo Gaditano (2) and Alcaldía del Ayuntamiento de Paiporta (2).
How competitive were electrical engineering tenders in Spain in December 2025?
On average 1.9 bids per contract (61 contracts with a known number of bids); 72% of contracts had a single bid.
What were the contracts worth in December 2025?
€1,583,805 (awarded value, 106 contracts); median about €770.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.