European public procurement and grants data from official registers · Data as of 17 November 2026; updated daily.

Market report

Construction management tenders in Spain — market report, June 2025

Construction management tenders in Spain in June 2025: 137 tenders published (+29% month on month, +3% year on year), estimated at €9,062,834 in total, and 158 contracts awarded (+32% month on month, +11% year on year), worth €16,366,342 (awarded value). Buyers with the most tenders: Infraestructures de la Generalitat de Catalunya, SAU (50), Infraestructures de la Generalitat de Catalunya, SAU (9) and Diputació de Tarragona (7); most contracts won: Cubic Estudi D'enginyeria SL (19), Einesa Cable,s.l (12) and Iplan Gestion Integral (7). On average 2.7 bids per contract; 52% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
137
Contracts awarded
158
Contract value awarded
€16,366,342
Bids per contract
2.7
Tenders published per month
050100150Jun 24: 133Jun 24: 133Jun 24Jul 24: 127Jul 24: 127Jul 24Aug 24: 74Aug 24: 74Aug 24Sep 24: 82Sep 24: 82Sep 24Oct 24: 132Oct 24: 132Oct 24Nov 24: 82Nov 24: 82Nov 24Dec 24: 75Dec 24: 75Dec 24Jan 25: 60Jan 25: 60Jan 25Feb 25: 78Feb 25: 78Feb 25Mar 25: 104Mar 25: 104Mar 25Apr 25: 90Apr 25: 90Apr 25May 25: 106May 25: 106May 25Jun 25: 137Jun 25: 137137Jun 25
Contracts awarded per month
050100150200Jun 24: 142Jun 24: 142Jun 24Jul 24: 114Jul 24: 114Jul 24Aug 24: 85Aug 24: 85Aug 24Sep 24: 100Sep 24: 100Sep 24Oct 24: 127Oct 24: 127Oct 24Nov 24: 89Nov 24: 89Nov 24Dec 24: 83Dec 24: 83Dec 24Jan 25: 60Jan 25: 60Jan 25Feb 25: 91Feb 25: 91Feb 25Mar 25: 118Mar 25: 118Mar 25Apr 25: 99Apr 25: 99Apr 25May 25: 120May 25: 120May 25Jun 25: 158Jun 25: 158158Jun 25

The highlighted bar is June 2025. Hover a bar for its figure; the table below has every value.

FigureJune 2025May 2025ChangeJune 2024Change
Tenders published137106+29%133+3%
Estimated value€9,062,834€24,885,736-64%€7,322,405+24%
Buyers5657-2%52+8%
Contracts awarded158120+32%142+11%
Contract value (awarded)€16,366,342€4,609,266+255%€11,729,378+40%
Winners9888+11%87+13%
Bids per contract2.72.4—3.9—
Single-bid contracts52%59%—45%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Cataluña 21
  • Castilla y León 9
  • Andalucía 5
  • Canarias 5
  • Comunidad de Madrid 4

Procedures

  • not stated 78
  • Direct award 26
  • Open procedure 17
  • Restricted procedure 9
  • Simplified procedure 7

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Construction project management

Questions and answers

How many construction management tenders were published in Spain in June 2025?
137 (by 56 buyers); for comparison, May 2025: 106, June 2024: 133.
Who won the most construction management tenders in Spain in June 2025?
By number of contracts: Cubic Estudi D'enginyeria SL (19), Einesa Cable,s.l (12), Iplan Gestion Integral (7), Eacom, Enginyers i Arquitectes, Consultors d'Obres i Muntatges, S.A (7) and BRD i Associats, arquitectes consultors SLP (4); 98 companies won contracts in all.
Which buyers published the most construction management tenders in June 2025?
Infraestructures de la Generalitat de Catalunya, SAU (50), Infraestructures de la Generalitat de Catalunya, SAU (9), Diputació de Tarragona (7), Consejería de la Presidencia de la Junta de Castilla y León (7) and Alcaldía del Ayuntamiento San Sebastián de la Gomera (3).
How competitive were construction management tenders in Spain in June 2025?
On average 2.7 bids per contract (82 contracts with a known number of bids); 52% of contracts had a single bid.
What were the contracts worth in June 2025?
€16,366,342 (awarded value, 158 contracts); median about €17,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.