Lift installation tenders in Czechia — market report, December 2025

Lift installation tenders in Czechia in December 2025: 58 tenders published (-24% month on month, -22% year on year), estimated at €3,703,931 in total, and 62 contracts awarded (-22% month on month, -19% year on year), worth €7,484,723 (contract value). Buyers with the most tenders: Statutární město Brno (4), Olomoucký kraj (3) and Západočeská univerzita v Plzni (2); most contracts won: Výtahy Vaněrka s.r.o. (4), Výtahy Line, s.r.o. (3) and STRABAG Pozemní a inženýrské stavitelství s.r.o. (3). On average 4.4 bids per contract; 9% of contracts had a single bid. Report made on 27 October 2026.

Tenders published
58
Contracts awarded
62
Contract value contract
€7,484,723
Bids per contract
4.4
Tenders published per month
050100150Dec 24: 74Dec 24: 74Dec 24Jan 25: 57Jan 25: 57Jan 25Feb 25: 70Feb 25: 70Feb 25Mar 25: 84Mar 25: 84Mar 25Apr 25: 106Apr 25: 106Apr 25May 25: 139May 25: 139May 25Jun 25: 127Jun 25: 127Jun 25Jul 25: 105Jul 25: 105Jul 25Aug 25: 82Aug 25: 82Aug 25Sep 25: 99Sep 25: 99Sep 25Oct 25: 71Oct 25: 71Oct 25Nov 25: 76Nov 25: 76Nov 25Dec 25: 58Dec 25: 5858Dec 25
Contracts awarded per month
050100150Dec 24: 77Dec 24: 77Dec 24Jan 25: 52Jan 25: 52Jan 25Feb 25: 60Feb 25: 60Feb 25Mar 25: 88Mar 25: 88Mar 25Apr 25: 92Apr 25: 92Apr 25May 25: 136May 25: 136May 25Jun 25: 117Jun 25: 117Jun 25Jul 25: 121Jul 25: 121Jul 25Aug 25: 91Aug 25: 91Aug 25Sep 25: 103Sep 25: 103Sep 25Oct 25: 84Oct 25: 84Oct 25Nov 25: 79Nov 25: 79Nov 25Dec 25: 62Dec 25: 6262Dec 25

The highlighted bar is December 2025. Hover a bar for its figure; the table below has every value.

FigureDecember 2025November 2025ChangeDecember 2024Change
Tenders published5876-24%74-22%
Estimated value€3,703,931€5,431,060-32%€3,892,074-5%
Buyers4249-14%45-7%
Contracts awarded6279-22%77-19%
Contract value (contract)€7,484,723€12,476,498-40%€7,626,560-2%
Winners3638-5%33+9%
Bids per contract4.43.2—2.2—
Single-bid contracts9%20%—30%—

Buyers with the most tenders

Companies with the most contracts

Where the tenders were

  • Jihomoravský kraj 2
  • Hlavní město Praha 1
  • Ústecký kraj 1
  • Kraj Vysočina 1
  • Olomoucký kraj 1

Procedures

  • not stated 50
  • Open procedure 6
  • Simplified procedure 2

Download the figures (CSV)

The report's aggregates: the figures, the comparisons and the top lists by name and count.

All reports: Lift installation and modernisation

Questions and answers

How many lift installation tenders were published in Czechia in December 2025?
58 (by 42 buyers); for comparison, November 2025: 76, December 2024: 74.
Who won the most lift installation tenders in Czechia in December 2025?
By number of contracts: Výtahy Vaněrka s.r.o. (4), Výtahy Line, s.r.o. (3), STRABAG Pozemní a inženýrské stavitelství s.r.o. (3), TREBILIFT, s.r.o. (2) and OTIS a.s. (2); 36 companies won contracts in all.
Which buyers published the most lift installation tenders in December 2025?
Statutární město Brno (4), Olomoucký kraj (3), Západočeská univerzita v Plzni (2), Město Kopřivnice (2) and Město Moravské Budějovice (2).
How competitive were lift installation tenders in Czechia in December 2025?
On average 4.4 bids per contract (11 contracts with a known number of bids); 9% of contracts had a single bid.
What were the contracts worth in December 2025?
€7,484,723 (contract value, 62 contracts); median about €10,000.

How the report is made

Tenders published: the tenders of the sector or topic whose first notice is dated in the month (a tender counts in its sector and in up to three topics). Contracts awarded: the awards dated in the month, whenever their tender was published. Values in EUR, by value kind (never added together); medians are approximate (±3 %). Comparisons: with the reports of the previous month and of the same month a year earlier, each made the same way. The report was made on 27 October 2026 from the data of that day and is not changed afterwards; sources publish late, so later data for the month are not in it.