Grant programme · Lithuania
Progress Measure No 03-001-06-03-05 ‘Implement measures to increase the use of RES in heating and cooling production in district heating and cooling’ under the 2021-2030 Energy Development Programme Activity 7 ‘Replacement of fossil fuels and deteriorated biofuel boilers with new biofuel or other renewable heat generation installations’
Progress Measure No 03-001-06-03-05 ‘Implement measures to increase the use of RES in heating and cooling production in district heating and cooling’ under the 2021-2030 Energy Development Programme Activity 7 ‘Replacement of fossil fuels and deteriorated biofuel boilers with new biofuel or other renewable heat generation installations’ (Lithuania): 24 grants in the last 24 months to 24 recipients; a typical grant is about €300,000. Data as of 17 November 2026; updated daily.
- Grants in the last 24 months
- 24
- Recipients
- 24
- Total, last 24 months
- ≈ €9,700,000
- Typical grant (median)
- ≈ €300,000
- Open calls
- 0
- Calls on the site
- 0
Open calls
No records yet.
Latest grants
Most grants went to
- Uždaroji akcinė bendrovė "Nemėžio komunalininkas" 1
- Uždaroji akcinė bendrovė "Nemenčinės komunalininkas" 1
- Uždaroji akcinė bendrovė "Plungės šilumos tinklai" 1
- Uždaroji akcinė bendrovė "Šakių šilumos tinklai" 1
- UAB Gren Trakai 1
- Uždaroji akcinė bendrovė "Pakruojo šiluma" 1
- Uždaroji akcinė bendrovė "Šalčininkų šilumos tinklai" 1
- Uždaroji akcinė bendrovė "Raseinių šilumos tinklai" 1
- Uždaroji akcinė bendrovė "Šilalės šilumos tinklai" 1
- Akcinė bendrovė "Rokiškio komunalininkas" 1
Grant calendars
Grants for projects that started between 17 November 2024 and 17 November 2026; amounts in euro at the Eurostat rate of each year.
Questions and answers
- When does Progress Measure No 03-001-06-03-05 ‘Implement measures to increase the use of RES in heating and cooling production in district heating and cooling’ under the 2021-2030 Energy Development Programme Activity 7 ‘Replacement of fossil fuels and deteriorated biofuel boilers with new biofuel or other renewable heat generation installations’ open calls?
- No call is open right now.
- How much is a grant from Progress Measure No 03-001-06-03-05 ‘Implement measures to increase the use of RES in heating and cooling production in district heating and cooling’ under the 2021-2030 Energy Development Programme Activity 7 ‘Replacement of fossil fuels and deteriorated biofuel boilers with new biofuel or other renewable heat generation installations’?
- In the last 24 months the median grant was about €300,000; 24 grants, about €9,700,000 in all.
- Who gets grants from Progress Measure No 03-001-06-03-05 ‘Implement measures to increase the use of RES in heating and cooling production in district heating and cooling’ under the 2021-2030 Energy Development Programme Activity 7 ‘Replacement of fossil fuels and deteriorated biofuel boilers with new biofuel or other renewable heat generation installations’?
- Most grants in the last 24 months: Uždaroji akcinė bendrovė "Nemėžio komunalininkas" (1), Uždaroji akcinė bendrovė "Nemenčinės komunalininkas" (1) and Uždaroji akcinė bendrovė "Plungės šilumos tinklai" (1).