EV charging station grants in Canada
EV charging station grants in Canada: 284 grants in the last 24 months to 189 recipients, about €170,000,000 in all; a typical grant is about €170,000. No call is open right now. Most grants went to BASELOAD POWER CORP. (9), BRITISH COLUMBIA HYDRO AND POWER AUTHORITY (7) and DASHCHARGER TECHNOLOGIES LTD. (6). Data as of 17 November 2026; updated daily.
- Grants in the last 24 months
- 284
- Recipients
- 189
- Total, last 24 months
- ≈ €170,000,000
- Typical grant (median)
- ≈ €170,000
- Open calls
- 0
Open calls
No open calls on this topic right now.
Latest grants
| Project | Recipient | Grant | Date |
|---|---|---|---|
| EV Fast Charging in High Priority Area | CORPWELL MAGNUM CAPITAL INC. | €622,161 | 29 July 2026 |
| Remote Sites | HYDRO-QUÉBEC | €3,110,807 | 29 July 2026 |
| EV Charger Installation at 1792318 ONTARIO INC. | 1792318 ONTARIO INC. | €451,536 | 29 July 2026 |
| EV Charging at National Parks | Ecamion Inc. | €690,510 | 29 July 2026 |
| Quebec–Toronto Electric Truck Corridor for Medium- and Heavy-Duty Vehicles | GRAPPE INDUSTRIELLE DES VÉHICULES ÉLECTRIQUES ET INTELLIGENTS | €1,244,323 | 24 July 2026 |
| Bear Hills Casino EV Fast Charging – Highway 2 / QEII Corridor | Louis Bull Tribe | €498,675 | 24 July 2026 |
| Greater Vancouver Zoo | GREATER VANCOUVER ZOO LTD | €155,540 | 22 July 2026 |
| EV Charging at 401 Dixie Hyundai | DIXIE MOTORS LP | €62,216 | 22 July 2026 |
| 90 Hastings St. Charging Stations | BANCROFT REAL ESTATE INVESTMENT INC | €119,299 | 16 July 2026 |
| Medium Heavy Duty Corridor Charging Hub | POWERON | €622,161 | 16 July 2026 |
Most grants went to
- Baseload Power Corp. 9
- British Columbia Hydro and Power Authority 7
- Dashcharger Technologies Ltd. 6
- Hwisel Soft Inc 5
- GCT Canada Limited Partnership 4
- Soneil International Ltd. 4
- Zone Signature 4
- Ontario Agency of Health Protection and Promotion 3
- Association of Alberta Municipalities 3
- Bracebridge Generation Ltd. 3
Programmes that fund this most often
In other countries
Vehicles
Grant calendars
Grants for projects that started between 17 November 2024 and 17 November 2026; amounts in euro at the Eurostat rate of each year.
Questions and answers
- EV charging station grants in Canada: which calls are open now?
- None right now; the page lists new ones as soon as they open.
- EV charging station grants in Canada: how much is a typical grant?
- In the last 24 months the median grant was about €170,000: half were smaller, half bigger (274 grants with an amount).
- EV charging station grants in Canada: who gets the most grants?
- In the last 24 months: BASELOAD POWER CORP. (9), BRITISH COLUMBIA HYDRO AND POWER AUTHORITY (7) and DASHCHARGER TECHNOLOGIES LTD. (6).
- EV charging station grants in Canada: which programmes fund it?
- Most grants came from Zero Emissions Vehicle Infrastructure Program (282), The Critical Minerals First and Last Mile Fund (previously The Critical Minerals Infrastructure Fund Program) (1) and The Critical Minerals Infrastructure Fund Program (1).